Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Quality Planting Material Of High Value Flower Crops
|
| Description |
Supply Of Quality Planting Material Of High Value Flower Crops
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_393037_1 |
|
Reference Number |
HORT/801 |
| Tender Fee | 6000 |
| EMD | 68000 |
| Tender Value | - |
| Place | MUNIMPUR, JHAJJAR |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=469298 |
| Start Date | July 22, 2024 18:30 |
| End Date |
Expired
01/08/2024
Expired 801 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Read moreProviding flower decoration to kalyana vedika for sri swamy vari jathara kalyanam 2026-27 at sri mallikarjunaswamy vari devasthanam, komuravelli (v and m), siddipet district
Providing flower decoration to kalyana vedika for sri swamy vari jathara kalyanam 2026-27 at sri mallikarjunaswamy vari devasthanam, komuravelli (v and m), siddipet district
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreRefilling of carbon dioxide (co2) and nitrogen (n2) gases in the cylinders provided by stpp on value rate contract basis for a period of two years to stpp, jaipur, mancherial, telangana
Refilling of carbon dioxide (co2) and nitrogen (n2) gases in the cylinders provided by stpp on value rate contract basis for a period of two years to stpp, jaipur, mancherial, telangana
Read moreProviding maintenance of avenue plantation, fruit and flower bearing plants, hedge plants and lawns existing in a b blocks premises and at (g + 4) project hostel building of township from october-2026 to march- 2027
Providing maintenance of avenue plantation, fruit and flower bearing plants, hedge plants and lawns existing in a b blocks premises and at (g + 4) project hostel building of township from october-2026 to march- 2027
Read more1) supply and arrangement of food to staff and other relevant items and 2) supply and delivery of flower decoration 3) arrangement of swimmers 4) arrangement of jammi at jr.college on the occasion of saddula bathukamma and dussera festival under municipal general funds (recall 1st)
1) supply and arrangement of food to staff and other relevant items and 2) supply and delivery of flower decoration 3) arrangement of swimmers 4) arrangement of jammi at jr.college on the occasion of saddula bathukamma and dussera festival under municipal general funds (recall 1st)
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read moreRequest for selection of consultant for the preparation of dpr for selection of suitable tube well sites, determination of pump capacity, assessment of water quality, required, electricity and related infrastructure and technical study of the proposed water supply system in biharsharif.
Request for selection of consultant for the preparation of dpr for selection of suitable tube well sites, determination of pump capacity, assessment of water quality, required, electricity and related infrastructure and technical study of the proposed water supply system in biharsharif.
Read moreSupply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Read moreof your Industry type