Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Echp Ii Replacement Of Broken Tire Rim In The Feed End Spider Cone Assembly Of Pc 2 A Rotary Breaker At Pch Ii
|
| Description |
Ttps Echp Ii Replacement Of Broken Tire Rim In The Feed End Spider Cone Assembly Of Pc 2 A Rotary Breaker At Pch Ii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_519028_1 |
|
Reference Number |
CE/SE/MI/TTPS/169/2024-2025 |
| Tender Fee | 0 |
| EMD | 19200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=617623 |
| Start Date | January 18, 2025 23:00 |
| End Date |
Expired
03/02/2025
Expired 615 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rotary breaker 1 discharge end and feed end spider cone tire reconditioning and blue matching in pch
Mtps-ii- m-ii circle-chp-i division - rotary breaker -1-discharge end and feed end spider cone tire reconditioning and blue matching in pch.
Read moreTtps- echp-ii- complete overhauling of 3 nos. ht motor located at pch-ii sch-ii.
Ttps- echp-ii- complete overhauling of 3 nos. ht motor located at pch-ii sch-ii.
Read moreTtps- echp-i- replacing the existing worn out driven sprocket pcd-2450mm, drive sprocket and roller simplex chain by new for pc-1b at pch-i.
Ttps- echp-i- replacing the existing worn out driven sprocket pcd-2450mm, drive sprocket and roller simplex chain by new for pc-1b at pch-i.
Read moreTtps- echp-ii- erection of in-line magnetic separator dismantled from conveyor-65 coal jetty-ii in conveyor-48b head end at pch-ii top floor inside ttps campus with complete overhauling work.
Ttps- echp-ii- erection of in-line magnetic separator dismantled from conveyor-65 coal jetty-ii in conveyor-48b head end at pch-ii top floor inside ttps campus with complete overhauling work.
Read moreEchp-i- complete overhauling of rotating parts in drive unit of rotary breaker rectification works in the tire, guide wheel and support wheel, complete alignment works, strengthening the feed end spider by fabricated and fixing the 12mm thick ms plat
Echp-i- complete overhauling of rotating parts in drive unit of rotary breaker rectification works in the tire, guide wheel and support wheel, complete alignment works, strengthening the feed end spider by fabricated and fixing the 12mm thick ms plat
Read moreEchp-ii- removal of coal chocking in primary crusher -2a/2b bend chute and all discharge chute for conveyor-48a b, bfd-2a 2b and receiving chute for bfd-3a3b during rainy season and wet coal discharging period at pch-ii.
Echp-ii- removal of coal chocking in primary crusher -2a/2b bend chute and all discharge chute for conveyor-48a b, bfd-2a 2b and receiving chute for bfd-3a3b during rainy season and wet coal discharging period at pch-ii.&#x0d
Read moreEchp-ii- upkeepment and cleaning of coal in belt feeder-3a3b, 2a2b, primary crusher-2a2b, shuttle feeder-1a1b, reject conveyor-2a, 2b 2c, and ground floor, deck sheets, walkwaysc.,at pch-ii
Echp-ii- upkeepment and cleaning of coal in belt feeder-3a3b, 2a2b, primary crusher-2a2b, shuttle feeder-1a1b, reject conveyor-2a, 2b 2c, and ground floor, deck sheets, walkwaysc.,at pch-ii
Read moreEchp-ii- upkeepment and cleaning of coal in belt feeder-3a3b, 2a2b, primary crusher-2a2b, shuttle feeder-1a1b, reject conveyor-2a, 2b 2c, and ground floor, deck sheets, walkwaysc.,at pch-ii
Echp-ii- upkeepment and cleaning of coal in belt feeder-3a3b, 2a2b, primary crusher-2a2b, shuttle feeder-1a1b, reject conveyor-2a, 2b 2c, and ground floor, deck sheets, walkwaysc.,at pch-ii
Read moreEchp-ii- removal of coal chocking in primary crusher -2a 2b bend chute and all discharge chute for conveyor-48a b, bfd-2a 2b and receiving chute for bfd-3a 3b during rainy season and wet coal discharging period at pch-ii.
Echp-ii- removal of coal chocking in primary crusher -2a 2b bend chute and all discharge chute for conveyor-48a b, bfd-2a 2b and receiving chute for bfd-3a 3b during rainy season and wet coal discharging period at pch-ii.
Read moreRectification works to the aee and ae mechanical office, je elect echp 2 office building, staff shed and common toilet located to near pch 2 building in echs 2 area at ttps
Rectification works to the aee and ae mechanical office, je&#x0d elect echp 2 office building, staff shed and common toilet&#x0d located to near pch 2 building in echs 2 area at ttps
Read moreof your Industry type