Tender Details
Particulars | Details |
---|---|
Title |
Echp Ii Upkeepment And Cleaning Of Coal In Belt Feeder 3 A3 B, 2 A2 B, Primary Crusher 2 A2 B, Shuttle Feeder 1 A1 B, Reject Conveyor 2 A, 2 B 2 C, And Ground Floor, Deck Sheets, Walkwaysc.,At Pch Ii
|
Description |
Echp Ii Upkeepment And Cleaning Of Coal In Belt Feeder 3 A3 B, 2 A2 B, Primary Crusher 2 A2 B, Shuttle Feeder 1 A1 B, Reject Conveyor 2 A, 2 B 2 C, And Ground Floor, Deck Sheets, Walkwaysc.,At Pch Ii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_409624_1 |
Reference Number |
CE/SE/MI/TTPS/63/2024-2025 |
Tender Fee | 0 |
EMD | 16500 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487373 |
Start Date | January 13, 2024 00:25 |
End Date |
29/01/2024 ( Expired 492 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreRepairing / reconditioning of the motor controlling pannel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.
Repairing / reconditioning of the motor controlling panel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.
Read moreSteel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreUpkeepment of jammed hopper no. 03 and 04 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of jammed hopper no. 03 and 04 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreUpkeepment of spilled materials from unit no. 916 and 929 belt conveyor floor of ps-9 building at madhuban coal washery under block-ii area, bccl
Upkeepment of spilled materials from unit no. 916 and 929 belt conveyor floor of ps-9 building at madhuban coal washery under block-ii area, bccl
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreUpkeepment of spilled materials from 501-2 belt conveyor, deck plate, gallery, rollers etc. at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from 501-2 belt conveyor, deck plate, gallery, rollers etc. at madhuban coal washery under block-ii area, bccl .
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreEchp-i- dismantling, transporting and overhauling of 30 kw travelling hopper motors at coal jetty-ii for utilizing in vibrating screens. belt feeders in sch-i.
Echp-i- dismantling, transporting and overhauling of 30 kw travelling hopper motors at coal jetty-ii for utilizing in vibrating screens. belt feeders in sch-i.&#x0d &#x0d
Read moreof your Industry type