Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening And Carpeting Of Road From Jayant Colony Gate To Nigahi More With Provision Of Comprehensive Maintenance For 5 Years Without Any Cost Implications.
|
| Description |
Strengthening And Carpeting Of Road From Jayant Colony Gate To Nigahi More With Provision Of Comprehensive Maintenance For 5 Years Without Any Cost Implications.
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_305024_1 |
|
Reference Number |
GM(CSR)/SGR/23-24/ETN-33 Dated 14.03.2024 |
| Tender Fee | 0 |
| EMD | 9.4 Lakh |
| Tender Value | - |
| Place | Singrauli |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=316034 |
| Start Date | March 15, 2024 22:30 |
| End Date |
Expired
01/04/2024
Expired 890 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road carpeting work from nigahi solar plant to nigahi silo of vstps (including part of old vip road of matwai gate approach)
Road carpeting work from nigahi solar plant to nigahi silo of vstps (including part of old vip road of matwai gate approach)
Read moreStrengthening of existing bituminous road from aldih more to mithani colliery gate at bmp group under sodepur area
Strengthening of existing bituminous road from aldih more to mithani colliery gate at bmp group under sodepur area
Read moreConst. of road link road pathways or any other road with or without drainage system (const of street pandeya mohalla inside pahari gate)
Const. of road link road pathways or any other road with or without drainage system (const of street pandeya mohalla inside pahari gate)
Read moreConstruction of cc road from ceti road ( pindertali) to chatri gram( 5.5 km ) under csr including comprehensive maintenance for 5 years without any cost implication.
Construction of cc road from ceti road ( pindertali) to chatri gram( 5.5 km ) under csr including comprehensive maintenance for 5 years without any cost implication.
Read moreCompletion of incomplete works for provision of r and i store building near gate security office inside technical area dmsrde, kanpur (risk and cost contract)
Completion of incomplete works for provision of r and i store building near gate security office inside technical area dmsrde, kanpur (risk and cost contract)
Read moreImprovement and strengthening of road by providing dense carpeting and providing and applying 2.5 mm thick road marking strips (retro reflective) of specified shade/ colour using hot thermoplastic paint from gate no. 1 to gate no. 2, flat no. 14 to 3
Improvement and strengthening of road by providing dense carpeting and providing and applying 2.5 mm thick road marking strips (retro reflective) of specified shade/ colour using hot thermoplastic paint from gate no. 1 to gate no. 2, flat no. 14 to 3
Read moreImprovement and strengthening of road by providing dense carpeting and cement concrete side berm from rani jhansi road d.d.a complex block-5 entry gate to flat no.48,motia khan in ward no.82 in kbz
Improvement and strengthening of road by providing dense carpeting and cement concrete side berm from rani jhansi road d.d.a complex block-5 entry gate to flat no.48,motia khan in ward no.82 in kbz
Read more1) standardisation of level crossing by shifting gate barrier, improvement of visibility, road surface and gate lodge standardisation at 44 nos. level crossings gate between bqa-msae section in adra division.2) provision of retaining wall/toe wall and strengthening of cess at beliatore and rainagar.
For complete deion and other details, please refer to tender
Read moreStrengthening & standardization of nrl-mae ng line track by re-alignment of curves, attention of joint, provision board for curve/turnout/lc gate, cess repairs at washout location etc.
For complete deion and other details, please refer to tender
Read moreStrengthening & standardization of nrl-mae ng line track by re-alignment of curves, attention of joint, provision board for curve/turnout/lc gate, cess repairs at washout location etc.
For complete deion and other details, please refer to tender
Read moreof your Industry type