Tender Details
About Tender
🏭 Procurement Opportunity: Bund Strengthening And Raising At Ttps 🌱 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Critical Project Of Strengthening And Raising The Existing Bund In The Primary Pond At The Tamil Nadu Thermal Power Station (Ttps) In The Ash Dyke Area. The Project Involves Elevating The Bund From Ch 930 M To Ch 1050 M Over A Length Of 120 Meters Towards The Main Spillway. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm A Tender Fee Of Inr 8400 Has Been Set, With An Earnest Money Deposit (Emd) Of The Same Amount. Interested Contractors Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Highest Standards Of Quality And Safety. Keywords: Tneb Limited, Bund Strengthening, Raising, Tamil Nadu Thermal Power Station, Infrastructure Project, Government Tender, Civil Construction, Emd, Ttps Ash DykeParticulars | Details |
---|---|
Title |
Strengthening And Raising The Existing Bund In The Primary Pond From Ch 930 M To Ch 1050 M From Hump Towards Main Spillway For A Length Of 120 M In Ash Dyke Area
|
Description |
Strengthening And Raising The Existing Bund In The Primary Pond From Ch 930 M To Ch 1050 M From Hump Towards&Amp#X0d
Main Spillway For A Length Of 120 M In Ash Dyke Area
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_458324_1 |
Reference Number |
CE SE C TTPS Spec. No 137 24 25 |
Tender Fee | 0 |
EMD | 8400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=544861 |
Start Date | June 29, 2024 23:30 |
End Date |
18/07/2024 ( Expired 277 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreProtection arrangement to the portion of western side ash bund ch 1700 to ch 2100 m of primary pond-ii at ash dyke.
Protection arrangement to the portion of western side ash bund ch 1700 to ch 2100 m of primary pond-ii at ash dyke.
Read moreMaintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.
Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.
Read moreEffective maintenance of ash dyke bund by regulating the water way to avoid stagnation of water and reverse flow, protecting the bund near discharge lines in primary pond -ii and regulating the ash slurry discharge at ash dyke.
Effective maintenance of ash dyke bund by regulating the water way to avoid stagnation of water and reverse flow, protecting the bund near discharge lines in primary pond -ii and regulating the ash slurry discharge at ash dyke.
Read moreNctps i cm circle cm ii watering to the tree saplings along the eastern side bund ch.3345.00m to ch.4625.00m in ash dyke area and maintenance for a period of four months from the date of commencement.
Nctps i cm circle cm ii watering to the tree saplings along the eastern side bund ch.3345.00m to ch.4625.00m in ash dyke area and maintenance for a period of four months from the date of commencement.
Read moreNctps i cm circle cm ii watering to the tree saplings along the western side and northern side bund ch.1250.00m to ch.3345.00m in ash dyke area and maintenance for a period of four months from the date of commencement.
Nctps i cm circle cm ii watering to the tree saplings along the western side and northern side bund ch.1250.00m to ch.3345.00m in ash dyke area and maintenance for a period of four months from the date of commencement.
Read moreProtection of ash dyke in ash bund area for units 4 and 5 and also regulating the flow in the existing spillway for the period from 01.04.2025 to 31.03.2026
Protection of ash dyke in ash bund area for units 4 and 5 and&#x0d also regulating the flow in the existing spillway for the period&#x0d from 01.04.2025 to 31.03.2026
Read moreAsh dyke protection of ash dyke in ash bund area for units 1 to 3 for the period from 01.04.2025 to 31.03.2026
Ash dyke &#x0d protection of ash dyke in ash bund area for units 1 to 3&#x0d for the period from 01.04.2025 to 31.03.2026
Read moreStrengthening and o and m of nh-354 2-lane/4-lane of section khemkaran town to start of amritsar bypass from chainage km 22.673 to chainage km 71.496 for length of 48.823 km in the state of punjab.
Strengthening and o and m of nh-354 2-lane/4-lane of section khemkaran town to start of amritsar bypass from chainage km 22.673 to chainage km 71.496 for length of 48.823 km in the state of punjab.
Read moreCc construction work in pathanpura 02 ward 12 from chaupra temple towards tehsil road to municipality market. (length 750 m and area 4.50 m)
Cc construction work in pathanpura 02 ward 12 from chaupra temple towards tehsil road to municipality market. (length 750 m and area 4.50 m)&#x0d
Read moreof your Industry type