Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of Gate End Box, Drill Panels, Drill Machine And Support Of Cables Within The District For 4 J 6 A And 4 J 7 A Depillaring Panel During Retreating Of Pillars Due To Extraction In 4 A Seam At Jhiria Ug Mine.
|
Description |
Shifting Of Gate End Box, Drill Panels, Drill Machine And Support Of Cables Within The District For 4 J 6 A And 4 J 7 A Depillaring Panel During Retreating Of Pillars Due To Extraction In 4 A Seam At Jhiria Ug Mine.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_313600_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/24-25/54 dtd 27.07.2024 |
Tender Fee | 0 |
EMD | 67700 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324978 |
Start Date | July 29, 2024 23:30 |
End Date |
20/08/2024 ( Expired 314 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreShifting of 04 nos. sub station including all accessories for depillaring of cm-4a, cm-4b and cm-5 pannel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Shifting of 04 nos. sub station including all accessories for depillaring of cm-4a, cm-4b and cm-5 pannel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreMaking of subsidence pillars over proposed depillaring panel no. 4j-7 and 4j-8 of 4a seam for monitoring and recording reading after subsided goaved out panels as per cmr-2017 for safety under mcp head of jhiria ug mine.
Making of subsidence pillars over proposed depillaring panel no. 4j-7 and 4j-8 of 4a seam for monitoring and recording reading after subsided goaved out panels as per cmr-2017 for safety under mcp head of jhiria ug mine.
Read moreLaying of haulage track line of 100m length with 30lbs rail on both side of track in depillaring panel no.4j-7 in 4a seam at jhiria ug mine.
Laying of haulage track line of 100m length with 30lbs rail on both side of track in depillaring panel no.4j-7 in 4a seam at jhiria ug mine.
Read moreShifting of gate and box, drill panels, drill machines and support of cables within the district for 4j-6b and 4j-7b depillaring panel of 4a seam at jhiria ug mine
Shifting of gate and box, drill panels, drill machines and support of cables within the district for 4j-6b and 4j-7b depillaring panel of 4a seam at jhiria ug mine
Read moreInstallation of trackline, pipe line and power cable for depillaring panel purpose at 7ls, 6d, 12ls and 17 ls panel of 4a seam at haldibari ug mine.
Installation of trackline, pipe line and power cable for depillaring panel purpose at 7ls, 6d, 12ls and 17 ls panel of 4a seam at haldibari ug mine.
Read moreShifting of 05 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments from vii seam to vi top seam for proposed depillaring cm panel c1 and c2 at bangwar ug mine of sohagpur area .
Shifting of 05 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments from vii seam to vi top seam for proposed depillaring cm panel c1 and c2 at bangwar ug mine of sohagpur area .
Read moreTransportation of incombustible materials from rajnagar ocm (sector- f) to haldibari ug mine subsidence area over the proposed depillaring panels (-) 6d,7lsa, 12ls and 17ls of 4a seam for filling of subsidence cracks/pot holes
Transportation of incombustible materials from rajnagar ocm (sector- f) to haldibari ug mine subsidence area over the proposed depillaring panels (-) 6d,7lsa, 12ls and 17ls of 4a seam for filling of subsidence cracks/pot holes
Read moreof your Industry type