Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Construction Opportunity: Rcc Isolation Stoppings At Jhiria Ug Mine 🏗️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Contractors For The Construction Of 51 Rcc Isolation Stoppings At The Jhiria Underground Mine. 🛠️ 📅 Submission Deadline: April 10, 2024, 6:00 Pm The Project Involves Work On The Proposed Panel No. 4 J 7, Including Sub Panels No. 4 J 7 A And 4 J 7 B, Within The 4 A Seam. The Successful Bidder Will Also Be Responsible For Sealing Between These Sub Panels. A Earnest Money Deposit (Emd) Of Inr 1,11,500 Is Required For Participation. Interested Contractors Should Submit Detailed Proposals, Including Technical Specifications, Methodology, And Financial Bids, By The Stipulated Deadline. Keywords: Construction, Rcc Isolation Stoppings, South Eastern Coalfields Limited, Secl, Public Sector Undertaking, Jhiria Ug Mine, Hasdeo Area, Tender, BidParticulars | Details |
---|---|
Title |
Construction Of 51 Nos. Rcc Isolation Stoppings In Proposed Panel No. 4 J 7(sub Panel No. 4 J 7 A And Sub Panel No. 4 J 7 B) Of 4 A Seam And Sealing Between Sub Panels 4 J 7 A And 4 J 7 B) Of 4 A Seam At Jhiria Ug Mine.
|
Description |
Construction Of 51 Nos. Rcc Isolation Stoppings In Proposed Panel No. 4 J 7(sub Panel No. 4 J 7 A And Sub Panel No. 4 J 7 B) Of 4 A Seam And Sealing Between Sub Panels 4 J 7 A And 4 J 7 B) Of 4 A Seam At Jhiria Ug Mine.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_305714_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/23-24/213 dtd 21.03.2024 |
Tender Fee | 0 |
EMD | 1.12 Lakh |
Tender Value | |
Place | Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=316780 |
Start Date | March 21, 2024 23:30 |
End Date |
10/04/2024 ( Expired 445 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar
Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar
 colliery
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction of 5 nos. fly ash bricks complete and prepar-atory isolation stoppings including all construction mate-rials and stacking of construction material for completion of the preparatory isolation stopping in e8a proposed depillaring panel
Construction of 5 nos. fly ash bricks complete and prepar-atory isolation stoppings including all construction mate-rials and stacking of construction material for completion of the preparatory isolation stopping in e8a proposed depillaring panel
Read moreConstruction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.
Construction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.
Read moreConstruction of 5 nos. of 0.25m thick ventilation stoppings and for repairing of 2 nos. of ventilation stoppings for the proposed panel bsp7 at bogra (rvi) seam of pit no. 3, j. k. nagar colliery
Construction of 5 nos. of 0.25m thick ventilation stoppings and for repairing of 2 nos. of ventilation stoppings for the proposed panel bsp7 at bogra (rvi) seam of pit no. 3, j. k. nagar colliery
Read moreConstruction of 7 nos.of isolation stoppings(02nos. full and 05 nos. preparatory stopping), for proposal panel w-x1(a) at no. 3 and 4 pit in nega rvlll seam under nimcha(r)colliery
Construction of 7 nos.of isolation stoppings(02nos. full and 05 nos. preparatory stopping), for proposal panel w-x1(a) at no. 3 and 4 pit in nega rvlll seam under nimcha(r)colliery
Read moreGap filling of preparatory isolation stoppings of panel nk32a in no 7 pit, amkola unit, in rvii seam under nimcha (r) colliery
Gap filling of preparatory isolation stoppings of panel nk32a in no 7 pit, amkola unit, in rvii seam under nimcha (r) colliery
Read moreConstruction of 5 nos. of isolation stoppings (3 preparatory and 2 full) in panel nk33(a) under nimcha (r) colliery
Construction of 5 nos. of isolation stoppings (3 preparatory and 2 full) in panel nk33(a) under nimcha (r) colliery
Read moreConstruction of 16 nos. sectionalisation stoppings for lhcm panel in r-iv seam of khottadih colliery, pandaveshwar area
Construction of 16 nos. sectionalisation stoppings for lhcm panel in r-iv seam of khottadih colliery, pandaveshwar area
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreof your Industry type