Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Vijayawada Division:
Sw I: Trr(p) Of Exg. 60 Kg/90 Uts Rails On Psc6 Sleepers 1660 Density With New 60 Kg/R260 Rails (Lwr) For A Total Length Of 4.20 Km Between Gdr Bza &Amp Ki Bza Sections.
Sw Ii: (I) Tfr(a/F): Through Renewal Of Fittings On Psc Sleeper Track From Km 429.600
431.400 On Dn Line For A Total Length Of 1.800 Km Between Bza Vskp Section,
(Ii): Gj: Through Renewal Of Glued Joints For A Total Of 43 Nos. (60kg) At Various Locations Between Ki Bza Section,
(Iii): Ttr (Rails)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78420276 |
|
Reference Number |
E-41-EAST-BZA-2024 |
| Tender Fee | 0 |
| EMD | 2.28 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78420276/viewNitPdf_4770573.pdf |
| Start Date | November 13, 2024 01:24 |
| End Date |
Expired
05/12/2024
Expired 677 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw-i: trr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660 density with new 60kg/r260 rails (lwr) for a total length of 4.20 km between gdr - bza & ki-bza sections sw-ii: (i) tfr(a/f): through renewal of fittings on psc sleeper track from km 429.600-431.400 on dn line for a total length of 1.800 km between bza-vskp section, (ii): gj:- through renewal of glued joints for a total of 43 nos. (60kg) at various locations between ki -bza section, (iii): ttr (rails): through turnout rails
For complete deion and other details, please refer to tender
Read moreName of the work:- dmm-gy, kpd-tpty& ru-tpty sections:- sw-i : through rails renewal of existing 52kg/60kg rails with new 60kg r260 rails for a total length of 28.34 kms. sw-ii: through complete track renewal of existing 52kg rails on psc6 sleepers/1540 density with new 60kg r260 rails on wider base sleeper/1660 density for a length of 2.30 kms. sw-iii: ttr-through turn out renewal of existing 52kg/60kg switches, lead rails and crossings on running lines with new 60kg thick web switches, l
For complete deion and other details, please refer to tender
Read moreSw-i : bza division: gudur - vijayawada (dn) - ctr (p) - 0.867 tkm, vijayawada-visakhapatnam (dn) - ctr(p) - 3.133 km with pqrs with new 60kg r260 grade rails on new wider base psc sleepers of 1660nos./km density & gnt -kcc (up & dn) - trr (p) - 1.048 km of exg. 60kg/90uts rails on psc6 sleepers 1660 density with new 60kg/r260 rails in den/central/bza jurisdiction.sw-ii : trr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660 density with new 60kg/r260 rails (lwr) for a total length of
For complete deion and other details, please refer to tender
Read moreSecunderabad division: bpq-kzj sections: sw- i: ttrr(fstwswcmsc):- through turnout renewal of exg. 52/60kg switches, lead rails and crossings in running lines with new fanshaped layout 60 kg thick web switches with weldable cms crossing incl.lead rails on fan shaped layout for a total 17 sets. (1 in 8.5--9, 1 in 12--8 sets), sw- ii: ttrr(fstws):- through turnout renewal of exg. 52/60kg switches, lead rails and crossings in running lines with new fansha
For complete deion and other details, please refer to tender
Read moreSw-i: through rail renewal (p) for a total length of 34.434 tkm in aden/nlda section. sw-ii: through ballast renewal (main line) by bcm for a total length of 16.536 tkm in aden/nlda section. sw-iii: through ballast renewal (loop lines) by manually for a total length of 8.355 tkm in aden/nlda section. sw-iv: through fittings renewal for a total length of 27.685 tkm in aden/nlda section. sw-v: through turnout renewal (fstwswcmsc) - 7nos in aden/nlda section. sw-vi: renewal of sejs with improve
For complete deion and other details, please refer to tender
Read moreExecution of various p-way works in connection with through rail renewal (primary) of existing 60kg 90uts rails with new 60kg 110 uts rails for a length of 1.396 tkm between baiguda - lakshmipur road stations, 1.515 tkm between rouli - leliguma stations, 1.300 tkm between parvatipuram - sitanagaram stations dn line and through turnout renewal (twswcmsc) - 66 sets, through turnout renewal (tsr) - 39 sets, sej - 04 sets & glued joints - 73 nos. on raipur - vizianagaram line and on kor
For complete deion and other details, please refer to tender
Read morePdpl-nzb sections: sw 1) ctr (s) of exg.90r/52kg/72uts rails on psc5 sleepers 1310nos/km density with 60kg/90uts rails (sh) on psc6 wider sleepers (new) 1540 nos./km including recoupment and increasing of ballast cushion to 25 cm. and deep screening of ballast for a total length of 4.847 kms. sw 2) trr (s) of exg.90r/52kg/72uts rails on psc5 sleepers 1310nos/km density with 60kg/90uts rails (sh) for a total length of 7.408kms. sw 3) tfr (all fittings): through renewal of fitting on psc sleeper
For complete deion and other details, please refer to tender
Read morePdpl-nzb sections: sw 1) ctr (s): of exg.90r/52kg/72uts rails on psc5 sleepers 1310nos/km density with 60kg/90uts rails (sh) on psc6/wider sleepers (new) 1540 nos./km including recoupment and increasing of ballast cushion to 25 cm. and deep screening of ballast for a total length of 4.847 kms. sw 2) trr (s): of exg. 90r/52kg/72uts rails on psc5 sleepers 1310nos/km density with 60kg/90uts rails (sh) for a total length of 7.408kms. sw 3) tfr (all fittings): through renewal of fitting on psc slee
For complete deion and other details, please refer to tender
Read morePdpl-nzb sections. sw 1) ctr (s) of exg. 90r/52kg/72uts rails on psc sleepers 1310nos/km density with 60kg /90uts rails (sh) on psc 6 wider sleepers (new) 1540 nos./km including recoupment and increasing of ballast cushion to 25cm. and deep screening of ballast for a total length of 4.847 kms. sw 2) trr (s) of exg. 90 r/52kg/72uts rails on psc 5 sleepers 1310nos/km density with 60kg/90uts rails (sh) for a total length of 7.408 kms. sw 3) tfr (all fittings) through renewal of fitting on psc
For complete deion and other details, please refer to tender
Read moreSw-i: through rail renewal (p) for a total length of 3.485 tkm in aden/north/gnt section. sw-ii: through ballast renewal (main line) by bcm for a total length of 28.447 tkm in aden/north/gnt section. sw-iii: through ballast renewal (loop lines) by manually for a total length of 9.566 tkm in aden/north/gnt section. sw-iv: through fittings renewal for a total length of 69.109 tkm (all fittings) & 22.576 tkm (rubber pad only) in aden/north/gnt section. sw-v: through turnout renewal (fstwswc
For complete deion and other details, please refer to tender
Read moreof your Industry type