Tender Details
Particulars | Details |
---|---|
Title |
Black Spot 12 Road Protection Work At Km 79 (Arki Mod) Of Banda Baberu Kamasin Rajapur Road (Sh 92)
|
Description |
Black Spot 12 Road Protection Work At Km 79 (Arki Mod) Of Banda Baberu Kamasin Rajapur Road (Sh 92)
|
Organisation | Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT |
Tender Id | 2025_CEJNS_1009683_1 |
Reference Number |
207/A-7 dated 31-01-2025 |
Tender Fee | 950 |
EMD | 2.34 Lakh |
Tender Value | |
Place | Chitrakoot |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1810786 |
Start Date | February 22, 2025 14:30 |
End Date |
28/02/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of approach road, additional approach road and protection work yamuna river bridge malav aligarh
Construction of approach road, additional approach road and protection work of 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh (u.p.)
Read moreof your Industry type