Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Link Road To Sanit Beema (By Way Of R/Wall, B/Wall, And Parapet) Under Capex
|
| Description |
Construction Of Link Road To Sanit Beema (By Way Of R/Wall, B/Wall, And Parapet) Under Capex
|
| Organisation | Union Territory of Ladakh |
| Tender Id | 2023_PWD_10704_3 |
|
Reference Number |
38 of R and B Khaltsi of 2023-24 |
| Tender Fee | 3000 |
| EMD | 2.43 Lakh |
| Tender Value | |
| Place | Executive Engineer R and B division Khaltsi |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in |
| Start Date | August 12, 2023 23:30 |
| End Date |
Expired
22/08/2023
Expired 1064 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of lastang beema road (by way of r/wall, b/wall, side drain and parapet) under sdp
Construction of lastang beema road (by way of r/wall, b/wall, side drain and parapet) under sdp
Read moreConstruction of link road to farka mangue (by way of 120mm gsb length 1000mtr and parapet). under capex
Construction of link road to farka mangue (by way of 120mm gsb length 1000mtr and parapet). under capex
Read moreConstruction of internal road to lardho village (by way of r/wall, b/wall, side drain) under capex
Construction of internal road to lardho village (by way of r/wall, b/wall, side drain) under capex
Read moreof your Industry type