Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Dry Brick On Edge Rasta From Pwd Road To Dera Baru Ram Kashyap
|
| Description |
Construction Of Dry Brick On Edge Rasta From Pwd Road To Dera Baru Ram Kashyap
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_483742_1 |
|
Reference Number |
2025F7057DAC 72B1 4CC8 B3EC C4068947D4E3702DEV |
| Tender Fee | 2180 |
| EMD | 17220 |
| Tender Value | - |
| Place | KASAN |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=561752 |
| Start Date | November 18, 2025 15:30 |
| End Date |
Expired
24/11/2025
Expired 325 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Litani, uklana, pavement of ipb rasta from uchana road to f/o sohan singh, jajanwala road to f/o mahabir s/o ishwar, uklana road to d/o jaipal, uklana road to f/o jagjeet s/o dhoop singh and timaliwala rasta to f/o baru ram s/o manphool (hgvy)
Litani, uklana, pavement of ipb rasta from uchana road to f/o sohan singh, jajanwala road to f/o mahabir s/o ishwar, uklana road to d/o jaipal, uklana road to f/o jagjeet s/o dhoop singh and timaliwala rasta to f/o baru ram s/o manphool (hgvy)
Read moreHgvy const. of brick paved rasta from kot kachhwa kalan to kot kachhwa khurd block ambala-1
Hgvy const. of brick paved rasta from kot kachhwa kalan to kot kachhwa khurd block ambala-1
Read moreProviding, fixing decorative pole and light ram bagh to under bridge rasta in mc mandi dabwali
Providing, fixing decorative pole and light ram bagh to under bridge rasta in mc mandi dabwali
Read moreConstruction of a brick-on-edge (khadanja) service road on the left bank of the malikpur minor from km 0.000 to km 13.800
Construction of a brick-on-edge (khadanja) service road on the left bank of the malikpur minor from km 0.000 to km 13.800
Read moreProviding and laying interlock 60mm over existing dry brick in tarlochan singh galli and santokh singh galli, np dhilwan
Providing and laying interlock 60mm over existing dry brick in tarlochan singh galli and santokh singh galli, np dhilwan
Read moreConstruction of c.c. road and rcc drain from pratap nagar house to sachin house and laying of dry brick (kharanja) for kabristan (approach road) in village-salarpur, yea wc-06
Construction of c.c. road and rcc drain from pratap nagar house to sachin house and laying of dry brick (kharanja) for kabristan (approach road) in village-salarpur, yea wc-06
Read moreWard no. 18 moh. adarsh nagar rosa me gali no. 01 dinesh sharma ke makan se jagdish chandra trivedi ke makan tak wa k.c. gupta ke makan se swargiya ram nath kashyap ke makan tak nali wa c.c. sadak ka nirman karya.
Ward no. 18 moh. adarsh nagar rosa me gali no. 01 dinesh sharma ke makan se jagdish chandra trivedi ke makan tak wa k.c. gupta ke makan se swargiya ram nath kashyap ke makan tak nali wa c.c. sadak ka nirman karya.
Read moreP/l cc and tiles in ward no 31 various streets (ram gali, dhobi mohalla, ravidas mohalla (landi kotal gurudvara backside), adj. landi kotal gurudvara, streets adj. and opp. crackers market, dera baba shrdagir bodi, satyanarayan mandir. 22.18 lacs
P/l cc and tiles in ward no 31 various streets (ram gali, dhobi mohalla, ravidas mohalla (landi kotal gurudvara backside), adj. landi kotal gurudvara, streets adj. and opp. crackers market, dera baba shrdagir bodi, satyanarayan mandir. 22.18 lacs
Read moreSteel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Read moreof your Industry type