Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Provision For 3 Phase Power Supply To 55 Kw Ht Gp Load Of Oav Building At Kanthibhuanri.
|
| Description |
Provision For 3 Phase Power Supply To 55 Kw Ht Gp Load Of Oav Building At Kanthibhuanri.
|
| Organisation | EIC-CIVIL | State Govt. and UT |
| Tender Id | 2024_EICCL_99731_1 |
|
Reference Number |
EE (R and B) BLS-II- 45 / 2023-24 |
| Tender Fee | 6000 |
| EMD | 18500 |
| Tender Value | - |
| Place | Balasore |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=485059 |
| Start Date | January 17, 2024 15:30 |
| End Date |
Expired
30/01/2024
Expired 990 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Asansol division:- provision of 3 phase smart meter at major load centre over asansol division.
Asansol division:- provision of 3 phase smart meter at major load centre over asansol division.
Read moreThree phase portable reference meter and electronic load
Three phase portable reference meter and electronic load
Read moreProvision of wheel wise load measurement by ddu eimwb.
Provision of wheel wise load measurement by ddu eimwb.
Read moreMotor gland and shaft sealing assembly,stator copper winding assembly - 410 kw, 3.3 kv ht motor,rear-side bearing assembly - 410 kw, 3.3 kv ht motor,front-side bearing assembly - 410 kw, 3.3 kv ht motor,motor coupling and flexible element assembly
Motor gland and shaft sealing assembly,stator copper winding assembly - 410 kw, 3.3 kv ht motor,rear-side bearing assembly - 410 kw, 3.3 kv ht motor,front-side bearing assembly - 410 kw, 3.3 kv ht motor,motor coupling and flexible element assembly
Read moreRepairing, rewinding of conveyor drive induction ht motors (250 kw, 6.6 kv and 200 kw, 6.6 kv) of chp under dudhichua project
Repairing, rewinding of conveyor drive induction ht motors (250 kw, 6.6 kv and 200 kw, 6.6 kv) of chp under dudhichua project
Read moreConstruction of 33kv line and installation of ht single point metering unit to cater the 1200 kw load for installation of ev chargers to crut bus depot at baripada under state govt. scheme.
Construction of 33kv line and installation of ht single point metering unit to cater the 1200 kw load for installation of ev chargers to crut bus depot at baripada under state govt. scheme.
Read moreProvision of water coolers over sealdah division under phase-ii.
Provision of water coolers over sealdah division under phase-ii.
Read moreProvision of ht 11 kv breaker vcb panel at mdss naval base karwar
Provision of ht 11 kv breaker vcb panel at mdss naval base karwar
Read more3 phase submersible pump-motor sets, motor capacity 40hp/30 kw and pump capacity 14500 gph
3 phase submersible pump-motor sets, motor capacity 40hp/30 kw and pump capacity 14500 gph
Read moreProvision of high mast at stations area over pryj division.(phase-i).
Provision of high mast at stations area over pryj division.(phase-i).
Read moreof your Industry type