Tender Details
Particulars | Details |
---|---|
Title |
Improvement Such As Widening And Strengthening Of Kundheigola To Utunia Via Khandadhuan Road From 10/550 Km To 15/543 Km In The District Of Deogarh Under State Plan For The Year 2023 24
|
Description |
Road Work
|
Organisation | Government of Odisha |
Tender Id | 2023_EICCL_93754_10 |
Reference Number |
CCENC (R AND B) /13/ 2023-24 |
Tender Fee | 10000 |
EMD | 8.25 Lakh |
Tender Value | |
Place | O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR |
Link | https://tendersodisha.gov.in |
Start Date | September 05, 2023 16:00 |
End Date |
20/09/2023 ( Expired 604 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreStrengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Strengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreProviding and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf
Providing and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf
Read moreGopiballavpur nayagram road from 35.00 km to 41.60km
Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.
Read moreWidening and strengthening of road from lunkaransar to baderan km 0/0 to 15/0
Widening and strengthening of road from lunkaransar to baderan km 0/0 to 15/0
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreRoad works
Fatapukur gadra road from 9.70 km to 12.00 kmp widening and strengthening work under jalpaiguri highway division in the district of jalpaiguri. project id pd242527580s000
Read moreof your Industry type