Tender Details
Particulars | Details |
---|---|
Title |
Ht Lt Line Extension And Improvement Works In East Dharapuram Sub Division
|
Description |
Running Works Contract For The Erection Works Of Lt Overhead Feeder, Ht Overhead Feeder, Structure Erection Works, Dismantling Works, Eos To Industrial, Domestic, Commercial, Temporary Supply, Oht, Street Light Dcw Works, Iin East Dharapuram Sub Divi
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 10000 |
Tender Value | |
Place | East Dharapuram sub division |
Link |
AAAAAAAAAA Login to view |
Start Date | June 04, 2025 21:15 |
End Date |
18/06/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreOne time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
Read moreOne time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreof your Industry type