Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtpsi Mill Plant Unit Ii Reconditioning Worn Out Of Head Pulleys Of 36 Gravimetric Feeders From Unit I To Iv
|
| Description |
Mtpsi Mill Plant Unit Ii Reconditioning Worn Out Of Head Pulleys Of 36 Gravimetric Feeders From Unit I To Iv
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_569915_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP / OT.135 / 2025-26 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=680858 |
| Start Date | June 17, 2025 18:00 |
| End Date |
Expired
01/07/2025
Expired 474 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of inlet span roller for 36 inch gravimetric feeders
Supply of inlet span roller for 36 inch gravimetric feeders
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreSupply of belt for 36 in gravimetric raw coal feeders of units 1 and 2/stg-i/btps
Supply of belt for 36 in gravimetric raw coal feeders of units 1 and 2/stg-i/btps
Read moreTtps es em iii replacement of worn out area of gi earth flat by new earth flat size 50 x 10 mm and reconditioning of earth pits in esp iv area of unit iv
Ttps es em iii replacement of worn out area of gi earth flat by new earth flat size 50 x 10 mm and reconditioning of earth pits in esp iv area of unit iv
Read moreReplacement of damaged/worn out various size fire hydrant and spray pipelines at various locations of ph-iv, stps, sarni.
Replacement of damaged/worn out various size fire hydrant and spray pipelines at various locations of ph-iv, stps, sarni.
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreTtps operation circle mpm ii unit iv supply and fixing of 92 al2o3 ceramic tiles of size 50 x 50 x 6 mm and 150 x 100 x 15 mm in the existing worn out multiple port outlets spool pipes and inner cones in unit iv mills
Ttps operation circle mpm ii unit iv supply and fixing of 92 al2o3 ceramic tiles of size 50 x 50 x 6 mm and 150 x 100 x 15 mm in the existing worn out multiple port outlets spool pipes and inner cones in unit iv mills
Read moreTtps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit iv
Ttps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit iv
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Read moreof your Industry type