Tender Details
Particulars | Details |
---|---|
Title |
Painting To Ms Towers Of 132 Kv Kamalapur To Manuguru Line From Location Number 1 To 21 In Omc Circle Warangal
|
Description |
Painting To Ms Towers Of 132 Kv Kamalapur To Manuguru Line From Location Number 1 To 21 In Omc Circle Warangal
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 573327 |
Reference Number |
e- SEOMCWGL22/2024-25 |
Tender Fee | 238 |
EMD | 13424 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | January 31, 2025 23:30 |
End Date |
28/02/2025 ( Expired 54 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Hiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Read moreErection of 3rd 80mva ptr at 132kv manikonda gis substation in omc/metro-central circle/metro zone
Erection of 3rd 80mva ptr at 132kv manikonda gis substation in omc/metro-central circle/metro zone
Read moreProviding short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Read morePerformance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Performance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreIn ward number 27 mathurapur, agreement with martyrdom from mubarak to latif, kallu to ram narayan and link, pipe in the neck and reason for construction of cc road. stop.
In ward number 27 mathurapur, agreement with martyrdom from mubarak to latif, kallu to ram narayan and link, pipe in the neck and reason for construction of cc road. stop.
Read moreConstruction of drain from jagdish verma house to praveen coaching class in front of the fort in ward number 03
Construction of drain from jagdish verma house to praveen coaching class in front of the fort in ward number 03
Read moreConstruction work of c c bearing code from prakash gaikwad house to rajendra gaikwad house in ward number 12
Construction work of c c bearing code from prakash gaikwad house to rajendra gaikwad house in ward number 12&#x0d
Read moreConstruction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028
Construction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028
Read moreof your Industry type