Tender Details

Particulars Details
Title
Balance Work Of Construction Remodeling Of Brakjuk Khul Styangkung Limb 2nd From Rd (200 500)mtr In Km 1st
Description
Balance Work Of Construction Remodeling Of Brakjuk Khul Styangkung Limb 2nd From Rd(200 500)mtr In Km 1st
Organisation Public Works Department | State Govt. and UT
Tender Id 2024_PWD_12412_1
Reference
Number
Fresh e- NIT NO- 124 of 2023-24-IFC Kargil
Tender Fee 180
EMD 34400
Tender Value
Place Kargil
Link
View Original Tender Notice

https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=31198

Start Date January 25, 2024 16:30
End Date
Expired 12/02/2024

Expired 874 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of balance work of family court building in district court campus, district- sant kabir nagar(u.p.)

Construction of balance work of family court building in district court campus, district- sant kabir nagar(u.p.)

Read more
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)

Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, &#x0d (length - 27.00 km)&#x0d

Read more
Earth work in berms cutting, removal thecks in bed and strenthening of banks from km 0.200 to 33.000 at various reaches of shahjahanpur branch

Earth work in berms cutting, removal thecks in bed and strenthening of banks from km 0.200 to 33.000 at various reaches of shahjahanpur branch

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Read more
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
Balance work for construction/remodeling of brakjung khul styangkung limb 2nd (200-500) mtr in km 1st and providing 05 no rcc, bed treatment at spots in km 1st in limb) including remodeling of khul from rd (500-600) mtr in limb 2nd

Balance work for construction/remodeling of brakjung khul styangkung limb 2nd (200-500) mtr in km 1st and providing 05 no rcc, bed treatment at spots in km 1st in limb) including remodeling of khul from rd (500-600) mtr in limb 2nd

Read more
Construction/remodeling of zamindari khul hydergroung from rd(0-223) mtr and limb 1st rd(0-450)mtr

Construction/remodeling of zamindari khul hydergroung from rd(0-223) mtr and limb 1st rd(0-450)mtr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise