Tender Details

Particulars Details
Title
Repair And Maintenance Of All Air Conditioners Installed At Different Locations Under Balram Ocp, Hingula Area For A Period Of One Year.
Description
Repair And Maintenance Of All Air Conditioners Installed At Different Locations Under Balram Ocp, Hingula Area For A Period Of One Year.
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 7800
Tender Value
Place BALRAM OCP
Link

AAAAAAAAAA

Login to view
Start Date April 28, 2025 15:30
End Date

08/05/2025 ( 11 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa

Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa

Read more
Rate contract for different maintenance of water and sump pump, skirt, scrapper, de, ds, v-fan etc at chp, ktps for two years.

Rate contract for different maintenance of water and sump pump, skirt, scrapper, de, ds, v-fan etc at chp, ktps for two years.

Read more
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Read more
Remaining work for construction of cc road strengthening of existing cc road and paver block work at different wards of nagar parishad mhowgaon under kayakalp yojna 2.0 - 2nd call

Remaining work for construction of cc road strengthening of existing cc road and paver block work at different wards of nagar parishad mhowgaon under kayakalp yojna 2.0 - 2nd call

Read more
Non-comprehensive amc of daikin make vrv ac units installed at line-5 and line-6 for one year (from 01.07.2025 to 30.06.2026)

Non-comprehensive amc of daikin make vrv ac units installed at line-5 and line-6 for one year ( from 01.07.2025 to 30.06.2026)

Read more
Annual maintenance contract amc of street lights at all wards of gram panchayat pokhadera n and m andaman andaman and nicobar islands for a period of one year.

Annual maintenance contract amc of street lights at all wards of gram panchayat pokhadera n and m andaman andaman and nicobar islands for a period of one year.

Read more
Operation of regulator gates at palla, boinchee, hoera, gopalpur and pandua under navigation sub division, b and i, pandua for a period of 24 (twenty four) months

Operation of regulator gates at palla, boinchee, hoera, gopalpur and pandua under navigation sub division, b and i, pandua for a period of 24 (twenty four) months

Read more
Supply, installation and commissioning of 30 nos. ofindustrial split air conditioners along with comprehensive amc for four (4) years for variouslocations under srtcc

Supply, installation and commissioning of 30 nos. ofindustrial split air conditioners along with comprehensive amc for four (4) years for variouslocations under srtcc

Read more
Cleaning, sweeping, washing etc of different floors, roof etc of administrative building area, time office area, security main gate office area, fire brigade and cleaning of balance bop area other than inside of buildings at stps for two years

Cleaning, sweeping, washing etc of different floors, roof etc of administrative building area, time office area, security main gate office area, fire brigade and cleaning of balance bop area other than inside of buildings at stps for two years

Read more
Afforestation of 9000 saplings work at kiom ml no 1111 at c block for the year 2025 26 as per r and r plan including 3 years maintenance after planting of saplings

Afforestation of 9000 saplings work at kiom ml no 1111 at c block for the year 2025 26 as per r and r plan including 3 years maintenance after planting of saplings

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise