Tender Details
Particulars | Details |
---|---|
Title |
3 Phase Panel Meter Digital,12 Way Neutral Connecting Bar,Mcb Panel Box 4 X 4 Ft,Mcb Panel Box 3 X
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5792394 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 08, 2025 03:13 |
End Date |
29/01/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dd-3 digital delay pedal,speaker box size 4ft x 3.5 ft,hdmi cable 15 meter,ahuja pa active stage mo
Read more
3 phase, 4 wire a.c. static lt trivector energy meter of class of accuracy 0.5s with dlms protocol
Supply of 3 phase, 4 wire a.c. static lt trivector energy meter of class of accuracy 0.5s with dlms protocol
Read moreSupply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&#x0d (6) cylinder with brass line
Read moreConstruction of of cc road from bimal das house to subhas das house to chandrapara ssk school at length 125 meter breadth 12 ft of chandmoni-ii gp of ratua-i block ,booth no-175,jl no-,mouza-chandrapara, gp chandmoni,block-i,1st phase
Construction of of cc road from bimal das house to subhas das house to chandrapara ssk school at length 125 meter breadth 12 ft of chandmoni-ii gp of ratua-i block ,booth no-175,jl no-,mouza-chandrapara, gp-chandmoni,block-i,1st phase
Read more2,5 sq mm wire coil r-3,y-3,bl-2,bla-4,g-3,10sq mm wire,1 inch pvc pipe,8 way db box,4 pole 40a iso
Read more
3 phase, 4 wire a.c. static ht- trivector energy meter of class of accuracy 0.5s with dlms protocol
3 phase, 4 wire a.c. static ht- trivector energy meter of class of accuracy 0.5s with dlms protocol
Read moreMcb 1,mcb 2,mcb 3,mcb 4,mcb 5,mcb 6,mcb 7,mcb 8,mcb 9,mcb 10,mcb 11,mcb 12,mcb 13,mcb 14,mcb 15
Read more
Steel serrated flooring- 0.75 mtr x 4 mtr,steel serrated flooring- 1-meter-wide x 3 meter long
Read more
Construction of double box cell bridge 3 x 24 m and 4 x 24m on nallah at sangharsh nagar dumping yard road in p. no. 26, nmc
Construction of double box cell bridge 3 x 24 m and 4 x 24m on nallah at sangharsh nagar dumping yard road in p. no. 26, nmc
Read moreof your Industry type