Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Shrink Disk Of Stacker Reclaimer And Bucket Reclaimer In
|
| Description |
Procurement Of Shrink Disk Of Stacker Reclaimer And Bucket Reclaimer Inchp At Ntpc Khargone
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_97265_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900303910 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | NTPC KHARGONE STPP |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=100475 |
| Start Date | May 23, 2025 23:00 |
| End Date |
Expired
28/05/2025
Expired 500 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreProcurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Procurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreHiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Read moreof your Industry type