Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upright Fluorecence Microscope With 01 Year Warranty Period,02nd Year Warranty Cost Of Equipment,03
|
| Description |
|
| Organisation | Department of Health and Family Welfare | Ministry of Health and Family Welfare |
| Tender Id | GEM/2024/B/5738966 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 21, 2024 21:30 |
| End Date |
Expired
13/01/2025
Expired 637 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Read moreAward of contract for photocopying work at gms office, mm area for a period of three (03) years.
Award of contract for photocopying work at gms office, mm area for a period of three (03) years.
Read moreDesign, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Design, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Read moreConstruction of anganwadi building center ward no.03 at thimmaipally of kosgi municipality in narayanpet district - est cost. rs.22.00 lakhs-sanctioned under kada 2026-27 grant 1st call
Construction of anganwadi building center ward no.03 at thimmaipally of kosgi municipality in narayanpet district - est cost. rs.22.00 lakhs-sanctioned under kada 2026-27 grant 1st call
Read morePackage 01/dmft/03 works/ in peddapally district estimate cost rs.90.00 lakhs. 1.c/o bt cc r/f r and b road to tenugupally in bompally(v), peddapally(m) peddapally district estimate cost rs.50.00 lakhs 2.metal road from arepalli 13th division to ryakaldevpalli, sulthanabad (m), peddapally district estimate cost rs.20.00 lakhs 3.metal road from 15th division (pusala) to ryakaldevpalli sulthanabad(m), peddapally district estimate cost rs.20.00 lakhs (dmft grant) (1st call)
Package 01/dmft/03 works/ in peddapally district estimate cost rs.90.00 lakhs. 1.c/o bt cc r/f r and b road to tenugupally in bompally(v), peddapally(m) peddapally district estimate cost rs.50.00 lakhs 2.metal road from arepalli 13th division to ryakaldevpalli, sulthanabad (m), peddapally district estimate cost rs.20.00 lakhs 3.metal road from 15th division (pusala) to ryakaldevpalli sulthanabad(m), peddapally district estimate cost rs.20.00 lakhs (dmft grant) (1st call)
Read moreAward of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Award of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Read moreSupply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type