Tender Details

Particulars Details
Title
Sonicator With 01 Year Warranty Period,02nd Year Warranty Cost Of Equipment,03rd Year Warranty Cost
Description
Organisation Department of Health and Family Welfare | Ministry of Health and Family Welfare
Tender Id GEM/2024/B/5380292
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date September 10, 2024 16:24
End Date
Expired 03/10/2024

Expired 738 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Ande Pavan Kumar
Ministry: Ministry Of Health And Family Welfare
Department: Department Of Health And Family Welfare
Organisation: National Institute Of Mental Health And Neuro Sciences (nimhans)

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On EMD Status MSE/MII Status Status
1 AGN ENTERPRISES - 28-09-2024 15:09:22 Start-up MII MSE Disqualified
2 ALLIED SCIENTIFIC PRODUCTS - 01-10-2024 19:31:15 Registered with designated Agency / Authority MII N/A Disqualified
3 ANALYTICAL TECHNOLOGIES LIMITED - 30-09-2024 13:24:54 MSE MII MSE Disqualified
4 GLOBAL BIOSCIENCE SOLUTIONS - 23-09-2024 12:49:32 Registered with designated Agency / Authority MII MSE Disqualified
5 JJBIOTEK - 02-10-2024 13:24:36 Registered with designated Agency / Authority MII MSE Qualified
6 LEADS INDIA LABORATORY EQUIPMENT CO. - 01-10-2024 12:29:39 Registered with designated Agency / Authority MII MSE Disqualified
7 SEMITECTS TECHNOLOGIES PRIVATE LIMITED - 28-09-2024 14:12:33 MSE MII Disqualified
8 ULTRA AUTOSONIC INDIA - 17-09-2024 10:36:00 Vendor Assessed MII MSE Disqualified
9 UNIGENETICS INSTRUMENTS PRIVATE LIMITED - 28-09-2024 16:53:41 Registered with designated Agency / Authority MII N/A Disqualified
Similar Tenders
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.

Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.

Read more
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.

Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise