Tender Details
About Tender
🚂 Procurement Opportunity: Feasibility And Drawing Services For Rail Line Realignment 📐 The Ministry Of Railways, Central Government, Invites Tenders From Experienced Professionals And Firms For The Execution Of A Project Aimed At Feasibility Checking And Preparation Of Drawings For The Realignment Of Curve And Station Yards On The Lae(ex) Tig(ex) Main Line. The Project Is To Facilitate The Enhancement Of Train Speeds To 130 Kmph And Includes A Total Station Survey Under The Jurisdiction Of Sr.Den(west)/Sbp At Bhubaneswar. 📅 Submission Deadline: May 16, 2024, 3:00 Pm Emd: Inr 4,66,000 Interested Parties Are Advised To Review The Complete Tender Document For Detailed Project Requirements And Submission Guidelines. Keywords: Ministry Of Railways, Feasibility Study, Drawing Preparation, Rail Line Realignment, Speed Enhancement, Total Station Survey, Tender, Central Government Ministry/DepartmentParticulars | Details |
---|---|
Title |
Feasibility Checking, Preparation Of Drawing For Realignment Of Curve And Station Yards In Connection With Raising Of Speed To 130 Kmph On Lae(ex) Tig(ex) Main Line (Up, Dn Line) With Carrying Total Station Survey Under The Jurisdiction Of Sr.Den(west)/Sbp.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74512285 |
Reference Number |
01-eT-SDENW-SBP-24 |
Tender Fee | 0 |
EMD | 46600 |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74512285/viewNitPdf_4530573.pdf |
Start Date | April 23, 2024 23:38 |
End Date |
16/05/2024 ( Expired 341 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Conducting feasibility study, investigation, detailed survey, detailed project report (dpr) preparation and detailed design work in connection with elimination of level crossings by construction of grade separators (rob/rub)/merger/di of roads on dabhoi-chhotaudepur section (17 nos) & vadodara-geratpur section (2 nos) of vadodara division (total 19 nos).
For complete deion and other details, please refer to tender
Read morePardi - atul section - electrical (power) work in connection with construction of important bridge no. 313 up and down line on new alignment between pardi and atul station in connection with increase of speed to 160 kmph in virar - surat section.
For complete deion and other details, please refer to tender
Read moreSignalling work in conncetion with earth work of construction of important bridge no. 313 up & dn line on new alignment including earthwork, track work and associated civil works (from chainage rly km 188200 to rly km 189 500) between pardi station and atul station in connection with increase of speed to 160 kmph in virar-surat section of mumbai division on western railway.
For complete deion and other details, please refer to tender
Read moreCaryingout structural design & preparation of drawing of foundation & sub structure of important/ major/ minor bridges, non standard rcc box bridges, checking adequacy of modification in super structure, preparation of gad/tad of lhs/rubs,station building gad, design and structural drawings, fob gad and design & drawing of foundations, design of thrust bed, ciculating area plans, drainage layout plan etc. in connection with jaipur-sawai madhopur doubling project.
For complete deion and other details, please refer to tender
Read moreConducting total station survey and preparation of survey site plan of 28500 sqm land of diet at garacharma, preparation of preliminary sketches and detailed working drawing with the emenities 02 nos classroom, 01 no computer room, laboratry ic voca
Conducting total station survey and preparation of survey site plan of 28500 sqm land of diet at garacharma, preparation of preliminary sketches and detailed working drawing with the emenities 02 nos classroom, 01 no computer room, laboratry ic voca
Read moreOhe modification work in connection with construction of important bridge no. 313 up & dn line on new alignment including earthwork, track work and associated civil works (from chainage rly km 188200 to rly km 189 500) between pardi station and atul station in connection with increase of speed to 160 kmph in virar-surat section of mumbai division
For complete deion and other details, please refer to tender
Read moreTrd related work in connection with the work of p.way and other allied work in connection with removal of permanent speed restriction (psr) on curve no. 18, 18a, 18b and 18c dn in jsgr-sbp section of sambalpur division.
For complete deion and other details, please refer to tender
Read moreRate contract for carrying out final location survey ( geotechnical stus, design, preparation of drawings) and other preliminary activities for preparation of dpr, epc tender documents in connection with anticipated survey work for newline, byepass line, doubling, flyover etc. of all 4 division of north western railway
For complete deion and other details, please refer to tender
Read moreConducting feasibility study, investigation, detailed survey with dgps /total station, marking of alignment, soil investigation, preparation of gad and submission of dpr for construction of rob/rub in lieu of total 13 lcs over gnt division. sw1:: . gnt -kcc section: 01 no. of lc (4) sw2 :: 12 no. of lcs gnt-ndkd section (4 ) : 6, 27, 40, 81, gnt-tel section (1) : 2a, gnt-ndl section (4) : 312, 181, 184, 206 and gnt-kcc section ( 3) 2,3 and 14
For complete deion and other details, please refer to tender
Read moreExecution of p.way and other allied works in connection with removal of permanent speed restriction (psr) on curve no. 18, 18a, 18b & 18c dn in jsgr-sbp section of sambalpur division.
For complete deion and other details, please refer to tender
Read moreof your Industry type