Title |
Installation Of Pump With Associate Electricals, 3 In Delivery Pipeline For A Length Of 900 M And Twice Shifting Of The Pump For Dewatering Of 13 L For Establishment Of Belt Along 13 L At Rvi Seam Of Mic, J.P.Colliery.
|
Description |
Installation Of Pump With Associate Electricals, 3 In Delivery Pipeline For A Length Of 900 M And Twice Shifting Of The Pump For Dewatering Of 13 L For Establishment Of Belt Along 13 L At Rvi Seam Of Mic, J.P.Colliery.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_326162_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/118 dated 16.01.2025 |
Tender Fee | 0 |
EMD | 9600 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338066 |
Start Date | January 21, 2025 16:30 |
End Date |
31/01/2025 ( Expired 105 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.
Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreDismentling, transportation, installation and extension of 1000mm wide belt conveyor for 7l(e) district along 7l(e) from 4d to 22dip,1000mm wide belt conveyor to be installation and extension for 7l(e) dist. of cmb-3, length 621mtr. (old 1000mm wide
Dismentling, transportation, installation and extension of 1000mm wide belt conveyor for 7l(e) district along 7l(e) from 4d to 22dip,1000mm wide belt conveyor to be installation and extension for 7l(e) dist. of cmb-3, length 621mtr. (old 1000mm wide
Read moreDay to day pipeline, pump shifting and installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of jagannath ocp, jagannath area for a period of one year
Day to day pipeline, pump shifting and installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of jagannath ocp, jagannath area for a period of one year
Read moreExtension of one no 1000 mm width pvc belt conveyor for a length of 530 meters with complete drive head along 2l from 59 dip to 71 dip in r v seam of mic jhanjra project colliery.
Extension of one no 1000 mm width pvc belt conveyor for a length of 530 meters with complete drive head along 2l from 59 dip to 71 dip in r v seam of mic jhanjra project colliery.
Read moreInstallation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreInstallation of pump with associate electricals, 3 in delivery pipeline for a length of 900 m and twice shifting of the pump for dewatering of 13l for establishment of belt along 13l at rvi seam of mic, j.p.colliery.
Installation of pump with associate electricals, 3 in delivery pipeline for a length of 900 m and twice shifting of the pump for dewatering of 13l for establishment of belt along 13l at rvi seam of mic, j.p.colliery.
Read moreDismantling and re-laying (from diverted root/path). providing hindrance free dumping area to the outsourcing company b.k.b of 3 rangex850 of 8 diameter pipeline used for dewatering of quarry no.03 and shifting of pump-motor with electrical of
Dismantling and re-laying (from diverted root/path). providing hindrance free dumping area to the outsourcing company b.k.b of 3 rangex850 of 8 diameter pipeline used for dewatering of quarry no.03 and shifting of pump-motor with electrical of
Read moreTransportation installation of 01 nos. 3 in dia pipe line length 1392 mtrs. from 0dip r-vi seam up to 71dip in r-v seam for spray pipeline in cm-1 section in r-v seam of mic, j.p.colliery
Transportation installation of 01 nos. 3 in dia pipe line length 1392 mtrs. from 0dip r-vi seam up to 71dip in r-v seam for spray pipeline in cm-1 section in r-v seam of mic, j.p.colliery
Read moreTransportation, installation, necessary fabrication, commissioning trial of 1200mm width,2 150kw,6.6kv double drive belt conveyor for a length of 120mtr and extension for 280 mtr. in length 7 times shifting along trunk road-6 t-6 west side, sect
Transportation, installation, necessary fabrication, commissioning trial of 1200mm width,2 150kw,6.6kv double drive belt conveyor for a length of 120mtr and extension for 280 mtr. in length 7 times shifting along trunk road-6 t-6 west side, sect