Installation Of Pump With Associate Electricals, 3 In Delivery Pipeline For A Length Of 900 M And Twice Shifting Of The Pump For Dewatering Of 13 L For Establishment Of Belt Along 13 L At Rvi Seam Of Mic, J.P.Colliery.
Description
Installation Of Pump With Associate Electricals, 3 In Delivery Pipeline For A Length Of 900 M And Twice Shifting Of The Pump For Dewatering Of 13 L For Establishment Of Belt Along 13 L At Rvi Seam Of Mic, J.P.Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_326162_1
Reference
Number
ECL/GM/JNR/EnM/A2/24-25/118 dated 16.01.2025
Tender Fee 0
EMD 9600
Tender Value
Place JHANJRA UNDERGROUND
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338066
Start Date January 21, 2025 16:30
End Date

31/01/2025 ( Expired 105 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.

Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.

Read more
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.

Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.

Read more
Dismentling, transportation, installation and extension of 1000mm wide belt conveyor for 7l(e) district along 7l(e) from 4d to 22dip,1000mm wide belt conveyor to be installation and extension for 7l(e) dist. of cmb-3, length 621mtr. (old 1000mm wide

Dismentling, transportation, installation and extension of 1000mm wide belt conveyor for 7l(e) district along 7l(e) from 4d to 22dip,1000mm wide belt conveyor to be installation and extension for 7l(e) dist. of cmb-3, length 621mtr. (old 1000mm wide

Read more
Day to day pipeline, pump shifting and installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of jagannath ocp, jagannath area for a period of one year

Day to day pipeline, pump shifting and installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of jagannath ocp, jagannath area for a period of one year

Read more
Extension of one no 1000 mm width pvc belt conveyor for a length of 530 meters with complete drive head along 2l from 59 dip to 71 dip in r v seam of mic jhanjra project colliery.

Extension of one no 1000 mm width pvc belt conveyor for a length of 530 meters with complete drive head along 2l from 59 dip to 71 dip in r v seam of mic jhanjra project colliery.

Read more
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia

Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia

Read more
Installation of pump with associate electricals, 3 in delivery pipeline for a length of 900 m and twice shifting of the pump for dewatering of 13l for establishment of belt along 13l at rvi seam of mic, j.p.colliery.

Installation of pump with associate electricals, 3 in delivery pipeline for a length of 900 m and twice shifting of the pump for dewatering of 13l for establishment of belt along 13l at rvi seam of mic, j.p.colliery.

Read more
Dismantling and re-laying (from diverted root/path). providing hindrance free dumping area to the outsourcing company b.k.b of 3 rangex850 of 8 diameter pipeline used for dewatering of quarry no.03 and shifting of pump-motor with electrical of

Dismantling and re-laying (from diverted root/path). providing hindrance free dumping area to the outsourcing company b.k.b of 3 rangex850 of 8 diameter pipeline used for dewatering of quarry no.03 and shifting of pump-motor with electrical of

Read more
Transportation installation of 01 nos. 3 in dia pipe line length 1392 mtrs. from 0dip r-vi seam up to 71dip in r-v seam for spray pipeline in cm-1 section in r-v seam of mic, j.p.colliery

Transportation installation of 01 nos. 3 in dia pipe line length 1392 mtrs. from 0dip r-vi seam up to 71dip in r-v seam for spray pipeline in cm-1 section in r-v seam of mic, j.p.colliery

Read more
Transportation, installation, necessary fabrication, commissioning trial of 1200mm width,2 150kw,6.6kv double drive belt conveyor for a length of 120mtr and extension for 280 mtr. in length 7 times shifting along trunk road-6 t-6 west side, sect

Transportation, installation, necessary fabrication, commissioning trial of 1200mm width,2 150kw,6.6kv double drive belt conveyor for a length of 120mtr and extension for 280 mtr. in length 7 times shifting along trunk road-6 t-6 west side, sect