Tender Details

Particulars Details
Title
Wbzp/Bgp/Nit 13/24 25
Description
Installation Of Tube Well With Submeshibl Pump Near Majdurline Under Bally Gp
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2024_ZPHD_756963_1
Reference
Number
WBZP/BGP/NIT-13/24-25
Tender Fee 250
EMD 2850
Tender Value
Place nisco
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1673186
Start Date September 24, 2024 22:30
End Date

28/09/2024 ( Expired 283 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Pre-qualification bid for design, manufacturing, testing, supply, installation, commissioning, training and performance testing of &ldquohigh capacity sheet cutting combined with multiple single note inspection system along with auto packing&rdquo

Pre-qualification bid for design, manufacturing, testing, supply, installation, commissioning, training and performance testing of &ldquohigh capacity sheet cutting combined with multiple single note inspection system along with auto packing&rdquo

Read more
Manufacture and supply of furniture for md and single accn of officers under wp-02 at naval station rambilli near visakhapatnam

Manufacture and supply of furniture for md&#x0d and single accn of officers under wp-02 at&#x0d naval station rambilli near visakhapatnam

Read more
Request for proposal (rfp) for selection of concessionaire for development of plug and play facilities under ppp mode in 50 acres on dbfot basis with a concession period of 45 years in sipcot panapakkam

Request for proposal (rfp) for selection of&amp#x0d concessionaire for development of plug and&amp#x0d play facilities under ppp mode in 50 acres on&amp#x0d dbfot basis with a concession period of 45 years in&amp#x0d sipcot panapakkam

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise