Tender Details
Particulars | Details |
---|---|
Title |
Investigation, Survey (On G.I.S. Vasis) And Construction Of 10 Mld Stp With 30 Kld C0 Treatment, I And D Of Drains And Structure, Rising Main, Treated Effluent Line With Scada Etc. In Auraiya Nagar Palika Parishad, District Auraiya Under S.B.M. 2.0
|
Description |
Investigation, Survey (On G.I.S. Vasis) And Construction Of 10 Mld Stp With 30 Kld C0 Treatment, I And D Of Drains And Structure, Rising Main, Treated Effluent Line With Scada Etc. In Auraiya Nagar Palika Parishad, District Auraiya Under S.B.M. 2.0
|
Organisation | U P Jal Nigam (HQ), Lucknow | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 23600 |
EMD | 30.2 Lakh |
Tender Value | |
Place | Auraiya |
Link |
AAAAAAAAAA Login to view |
Start Date | March 31, 2025 16:30 |
End Date |
28/04/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Read moreInvestigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Investigation survey on gis basis and construction of 10.20 mld stp with 19.20 co treatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInterception and di of drains and stp with co treatment and associated works in nagar palika parishad sikandrabad district bulandshahr under sbm u 2 programme
Construction of 8 mld stp with 11 kld co treatment and associated works, rising main, i d works of 3 drains, ips, sewer line etc
Read moreInterception and di of drains and stp with co treatment and associated works in nagar palika parishad jahangirabad district bulandshahr under sbm u 2 programme
I d of 4 drains, construction of 6 mld stp and 9 kld co treatment and associated works, sewer line, rising main etc.
Read moreInvestigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on gis basis and construction of 6 mld stp with cotreatment including mps i and d of drains and structure ips rising main treated effluent line with scada etc
Investigation survey on gis basis and construction of 6 mld stp with cotreatment including mps i and d of drains and structure ips rising main treated effluent line with scada etc
Read moreMaster sewerage scheme faridabad. designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Read moreSurvey, soil investigation, design, supply, laying, construction and commissioning of stp of 40 mld tigriya badshah and sewer line of 64 km and 1 no. ips of 30 mld and pumping main including house service connection as per scope of work with 10 y
Survey, soil investigation, design, supply, laying, construction and commissioning of stp of 40 mld tigriya badshah and sewer line of 64 km and 1 no. ips of 30 mld and pumping main including house service connection as per scope of work with 10 y
Read moreSurvey, soil investigation, design, supply, laying, construction and commissioning of stp of 80 mld dhankhedhi and sewer line of 163 km and 1 no. mps of 80 mld and pumping main including house service connection as per scope of work with 10 years
Survey, soil investigation, design, supply, laying, construction and commissioning of stp of 80 mld dhankhedhi and sewer line of 163 km and 1 no. mps of 80 mld and pumping main including house service connection as per scope of work with 10 years
Read moreSurvey, soil investigation, design, construction and commissioning of sewerage network of 252.80 km, trunk main of 6.03 km including 5 intermittent pumping stations, 2 stp having capacity 24 mi.d and 12 mld respectively along with pumping station, ex
Survey, soil investigation, design, construction and commissioning of sewerage network of 252.80 km, trunk main of 6.03 km including 5 intermittent pumping stations, 2 stp having capacity 24 mi.d and 12 mld respectively along with pumping station, ex
Read moreof your Industry type