Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Replacing Damaged Poles And Tightening Loose Wires Of Lt/Ht Lines As Per Requirement In The Jurisdiction Of The Electricity Distribution Sub Division Nizamabad
|
Description |
The Work Of Replacing Damaged Poles And Tightening Loose Wires Of Lt/Ht Lines As Per Requirement In The Jurisdiction Of The Electricity Distribution Sub Division Nizamabad
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2025_PVVNV_1038089_1 |
Reference Number |
15/EDC-1(A)/2025-26 |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | EE EDD-3 Azamgarh |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1881949 |
Start Date | May 10, 2025 21:30 |
End Date |
21/05/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Read moreReplacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.
Replacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.
Read moreSystem improvement by drawl of ht and lt line at dc block under newtown division.
System improvement work by drawl of ht and lt line with installation of shunt trip switchgear rmu dtr lt kiosk fpb db etc. at dc block of new town ccc-i under new town division.
Read moreWork of construction of sources, rising main pipelines, cwr, ohsr, ph, internal village distribution pipeline and fhtc including one year dlp of village kaimasa under sub division laxmangarh under jjm in the jurisdiction of phed division kathumar
Work of construction of sources, rising main pipelines, cwr, ohsr, ph, internal village distribution pipeline and fhtc including one year dlp of village kaimasa under sub division laxmangarh under jjm in the jurisdiction of phed division kathumar
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).
Read moreAddition alteration improvement of water supply distribution pipe lines system of 11 grenadiers and its connected areas in ambala cantt and addn altn to sub main and main sewage system of kota under ge utility ambala cantt
Addition alteration improvement of water supply distribution pipe lines system of 11 grenadiers and its connected areas in ambala cantt and addn altn to sub main and main sewage system of kota under ge utility ambala cantt
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (25 nos lc gates) in lucknow division /ner under jurisdiction of tier-2/gorakhpur(lucknow territory)
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (25 nos lc gates) in lucknow division /ner under jurisdiction of tier-2/gorakhpur(lucknow territory)
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work ( 11 nos lc gates ) in jhansi division/ncr under jurisdiction of tier-2/ jhansi (delhi territory).
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work ( 11 nos lc gates ) in jhansi division/ncr under jurisdiction of tier-2/ jhansi (delhi territory).