Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Main Gate And Board At Ob Dump Rehab Site Under Rajmahal Area.
|
| Description |
Construction Of Main Gate And Board At Ob Dump Rehab Site Under Rajmahal Area.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_329250_1 |
|
Reference Number |
ECL/RJML/AGM/AE(C)/ e-Ten/24-25/536 Dt-16.02.2025 |
| Tender Fee | 0 |
| EMD | 9200 |
| Tender Value | - |
| Place | OB Dump rehab site |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341269 |
| Start Date | February 18, 2025 00:25 |
| End Date |
Expired
27/02/2025
Expired 591 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreProviding temporary illumination from siddipet arch gate to gurjakunta arch gate to komuravelli arch gate and also thimmareddypalli arch gate at sri mallikarjuna swamy vari devasthnam, komuravelli (v and m), siddipet district
Providing temporary illumination from siddipet arch gate to gurjakunta arch gate to komuravelli arch gate and also thimmareddypalli arch gate at sri mallikarjuna swamy vari devasthnam, komuravelli (v and m), siddipet district
Read moreProviding temporary illumination from cheruvu arch gate to temple surrounding upto komuravelli near bus stand arch gate (y junction)
Providing temporary illumination from cheruvu arch gate to temple surrounding upto komuravelli near bus stand arch gate (y junction)
Read moreConstruction of public staircase first floor in front of entry gate and exist gate of old mlcp in ward no-28.
Construction of public staircase first floor in front of entry gate and exist gate of old mlcp in ward no-28.
Read moreSolenoid values for pa general gate,rc shut off gate,purge air dampers and oil corner of mills,hfo and ldo
Solenoid values for pa general gate,rc shut off gate,purge air dampers and oil corner of mills,hfo and ldo
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreImprovement of road from high tension double road to swd way to dr.chandraraje urs house and site no 118 to site no 127 near annapurneshwari temple at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Improvement of road from high tension double road to swd way to dr.chandraraje urs house and site no 118 to site no 127 near annapurneshwari temple at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Read moreof your Industry type