Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
1 Water Proofing Treatment Of Roof At Department Of Geology 2 Construction Of Plinth Protection Behind Main Building Of Department Of Geology
|
Description |
1 Water Proofing Treatment Of Roof At Department Of Geology 2 Construction Of Plinth Protection Behind Main Building Of Department Of Geology
|
Organisation | Aligarh Muslim University | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 16700 |
Tender Value | |
Place | Aligarh Muslim University Aligarh |
Link |
AAAAAAAAAA Login to view |
Start Date | June 14, 2025 16:10 |
End Date |
04/07/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreThree-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreEpc package for development of 10mld water treatment plant package for
Epc package for development of 10mld water treatment plant package forngel green hydrogen hub at pudimadaka anakapalli district andhra pradesh
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of rcc drain at ward no 45 main road conveyer belt to ashok panday house
Construction of rcc drain at ward no 45 main road conveyer belt to ashok panday house
Read moreConstruction of cc road at c e t i basti ward no 1
Construction of cc road at c e t i basti ward no 1
Read moreConstruction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Read moreConstruction of storage building for hazardous waste at nfl panipat
Construction of storage building for hazardous waste at nfl panipat
Read moreProvn of roof top solar plant totalling 1000 kw at certain building at jhansi
Provn of roof top solar plant totalling 1000 kw at certain 
 building at jhansi
Read moreof your Industry type