| Particulars | Details |
|---|---|
| Title |
Widening And Reconstruction To 2 Lane With Paved Shoulder From Runarayanpur To Pokharia More From (Design Km 8.56) To (Design Km 38.656) And (Design Km 40.456) To (Design Km 46.375) Of Nh 419 In The State Of Jharkhand On Epc Mode.
|
| Description |
Widening And Reconstruction To 2 Lane With Paved Shoulder From Runarayanpur To Pokharia More From (Design Km 8.56) To (Design Km 38.656) And (Design Km 40.456) To (Design Km 46.375) Of Nh 419 In The State Of Jharkhand On Epc Mode.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2023_MoRTH_764328_1 |
|
Reference Number |
- |
| Tender Fee | 11800 |
| EMD | 1.77 Crore |
| Tender Value | - |
| Place | Rupnarayanpur to Pokhariya More |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=803492 |
| Start Date | July 29, 2023 15:40 |
| End Date |
Expired
28/02/2024
Expired 960 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreof your Industry type