Supply Installation, Erection, Testing And Commissioning And Replacement Of Major And Minor Item Of Grid Tied Roof Mounted Solar Pv Power Plant
Description
Request For Proposal (Rfp) For Selection Of Contractor For Providing Supply Installation, Erection, Testing And Commissioning And Replacement Of Major And Minor Item Of Grid Tied Roof Mounted Solar Pv Power Plant On Various Location
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id 2024_UAD_352206_1
Reference
Number
06 CE/EandM
Tender Fee 14034
EMD 80500
Tender Value -
Place Indore
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=500006

Start Date May 17, 2025 23:30
End Date
Expired 16/06/2025

Expired 488 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)

Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)

Read more
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh

Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh

Read more
Proposal for solar pv plant of 211kwp 3 phase on grid solar rooftop/ground mounted at 6 mld stp near balaji colony railway line ke piche kalanada makrana

Proposal for solar pv plant of 211kwp 3 phase on grid solar rooftop/ground mounted at 6 mld stp near balaji colony railway line ke piche kalanada makrana

Read more
Repairing and maintenance of roof mounted cab ac units during minor and major inspection schedule of 3 phase locomotives (wag9 & ef12k) at diesel loco shed, raipur for a period of 02 years. qty: 59 locos

Repairing and maintenance of roof mounted cab ac units during minor and major inspection schedule of 3 phase locomotives (wag9 & ef12k) at diesel loco shed, raipur for a period of 02 years. qty: 59 locos

Read more
Dismantling and reinstallation of existing 20kwp grid connected rooftop solar power plants including solar pv modular, installed on roof of chancer bhaga girls hostel building at hp university, shimla-5

Dismantling and reinstallation of existing 20kwp grid connected rooftop solar power plants including solar pv modular, installed on roof of chander bhaga girls hostel building at hp university, shimla-5

Read more
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii

Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii

Read more
Design, supply, erection, testing, commissioning and operation and maintenance (oandm) for 25 years of net meter connected ground mounted solar carport power plant of

(i) distt. park along with ng drain outer ring road to khayala bridge-1500 kwp(ac capacity) and (ii) mp green belt mangolpuri-300 kwp(ac capacity) under resco mode through tariff based competitive bidding.

Read more
Implementation of tentative of 50 mwp cumulative grid connected roof top solar pv systems under resco mode at various locations in the state of punjab with payment security mechanism

Implementation of tentative of 50 mwp cumulative grid connected roof top solar pv systems under resco mode at various locations in the state of punjab with payment security mechanism

Read more
Design, engineering, supply, erection, commissioning, ensuring connectivity permissions of 1086 kw grid connected solar roof top power plants including 5years camc after successful commissioning at jagannath ocp

Design, engineering, supply, erection, commissioning, ensuring connectivity permissions of 1086 kw grid connected solar roof top power plants including 5years camc after successful commissioning at jagannath ocp