Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
M/O Completed Scheme Finishing And Furnishing I/C T.C. Etc. Complete At Vikas Sadan.
|
| Description |
Cleaning Of Sewer Line, Storm Water Drain, Storage Water Tank And Other Misc. Maintenance Work In Vikas Sadan.
|
| Organisation | Delhi Development Authority | Central Govt. Ministry/Department |
| Tender Id | 2024_DDA_814811_1 |
|
Reference Number |
07/EE/SMD-IV/DDA/2024-25 (SHORT TENDER NOTICE) |
| Tender Fee | 0 |
| EMD | 29048 |
| Tender Value | - |
| Place | EE/SMD-IV/DDA/Vikas Sadan INA New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=856297 |
| Start Date | July 06, 2024 18:25 |
| End Date |
Expired
11/07/2024
Expired 827 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
M/o completed scheme finishing and furnishing i/c t.c. etc. complete at vikas sadan.
General repair and maintenance work in c block i/c ms stairs at terrace, upgradation of dispensary and other misc. work in vikas sadan.
Read moreUp-gradation of existing cctv surveillance system at vikas sadan.
Up-gradation of existing cctv surveillance system at vikas sadan.
Read moreRepair of complete seats with furnishing work
Repair of complete seats with furnishing work
Read moreWork no. 02 mathura vrindavan vikas pradhikaran bhavan ke finishing, vidhutikaran evam bahya vikas ka karya
Work no. 02 mathura vrindavan vikas pradhikaran bhavan ke finishing, vidhutikaran evam bahya vikas ka karya
Read moreRemaining work for finishing and furnishing work at new ministers bungalow and office block (bungalow no.-01 to 11) at smart city, dhurwa, ranchi
Remaining work for finishing and furnishing work at new ministers bungalow and office block (bungalow no.-01 to 11) at smart city, dhurwa, ranchi
Read moreOutsourcing of cab furnishing activities and e-70/ccb panel mounting & its complete connection activities in 209 nos. of wag-9hc locomotive at dlw/clw/dankuni for financial years 2026-27 & 2027-28.
Outsourcing of cab furnishing activities and e-70/ccb panel mounting & its complete connection activities in 209 nos. of wag-9hc locomotive at dlw/clw/dankuni for financial years 2026-27 & 2027-28.
Read moreCustom bid for services - works contract for making of transformer tank component by flame cutting complete blanking of transformer tank assemblies and finishing after one coat primer of transformer tank assemblies as per docket
Custom bid for services - works contract for making of transformer tank component by flame cutting complete blanking of transformer tank assemblies and finishing after one coat primer of transformer tank assemblies as per docket
Read moreCustom bid for services - transformer tanks and its components assemblies complete work including handling of transformer tank components finishing & cleaning of transformer tank before dispatch to trm and clamping of rim and sub assemblies for e..
Custom bid for services - transformer tanks and its components assemblies complete work including handling of transformer tank components finishing & cleaning of transformer tank before dispatch to trm and clamping of rim and sub assemblies for e..
Read moreProviding and fixing 12 mm thick hdmhr board wall panelling over prepared plywood base framework including cnc routing grooving screws adhesive edge finishing joints and accessories complete,providing and fixing 12 mm thick commercial plywood backing base for wall panelling including cutting matching joints screws plugs adhesive and fixing over prepared framework complete,providing and applying deco decorative laminate over wooden substrate including surface preparation adhesive cutting pressing trimming edge finishing matching joints and accessories complete,providing fabricating and fixing custom made judge bench with hardwood or plywood framework hdhmr or decorative finish storage drawers cable management raised front fascia hardware and accessories,providing fabricating and fixing custom made witness box with hardwood or plywood framework decorative panelling handrail raised enclosure approved finish hardware and fixing complete,providing and placing custom made reader table with engineered wood or plywoo
Providing and fixing 12 mm thick hdmhr board wall panelling over prepared plywood base framework including cnc routing grooving screws adhesive edge finishing joints and accessories complete,providing and fixing 12 mm thick commercial plywood backing base for wall panelling including cutting matching joints screws plugs adhesive and fixing over prepared framework complete,providing and applying deco decorative laminate over wooden substrate including surface preparation adhesive cutting pressing trimming edge finishing matching joints and accessories complete,providing fabricating and fixing custom made judge bench with hardwood or plywood framework hdhmr or decorative finish storage drawers cable management raised front fascia hardware and accessories,providing fabricating and fixing custom made witness box with hardwood or plywood framework decorative panelling handrail raised enclosure approved finish hardware and fixing complete,providing and placing custom made reader table with engineered wood or plywoo
Read moreMild steel channel 5 inch x 2.5 inch,mild steel angle 2 inch,mild steel square rectangular pipe 5 inch x 2.5 inch,mild steel round rod 16 mm dia,mild steel flat 2.5 inch width,heavy duty wheel roller,heavy duty centre bearing hub,mild steel arm 2 inch,mild steel structure 23 ft x 8 ft complete fabrication,cutting drilling fitting welding and assembly charges,surface preparation primer and painting finishing charges
Mild steel channel 5 inch x 2.5 inch,mild steel angle 2 inch,mild steel square rectangular pipe 5 inch x 2.5 inch,mild steel round rod 16 mm dia,mild steel flat 2.5 inch width,heavy duty wheel roller,heavy duty centre bearing hub,mild steel arm 2 inch,mild steel structure 23 ft x 8 ft complete fabrication,cutting drilling fitting welding and assembly charges,surface preparation primer and painting finishing charges
Read moreof your Industry type