Tender Details
Particulars | Details |
---|---|
Title |
Nctps I Se M Ii Ichs Dn Supply And Erection Of Fire Hydrant Pipe Line For Yard No 5
|
Description |
Nctps I Se M Ii Ichs Dn Supply And Erection Of Fire Hydrant Pipe Line For Yard No 5
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_531607_1 |
Reference Number |
CE/NCTPSI/SE/MII/SpNo82/24-25 |
Tender Fee | 0 |
EMD | 35800 |
Tender Value | |
Place | NCTPS-I |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632733 |
Start Date | March 11, 2025 17:10 |
End Date |
24/03/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreManufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Manufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Read moreof your Industry type