Tender Details
Particulars | Details |
---|---|
Title |
Supply And Construction Of Of Internal Pathway (Size 833 M X 1.2 M) Under 56 Inf Div Aor
|
Description |
Supply And Construction Of Of Internal Pathway (Size 833 M X 1.2 M) Under 56 Inf Div Aor
|
Organisation | IHQ of MoD (Army)-(OSCC) | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 2.25 Lakh |
Tender Value | |
Place | JANBO ARUNACHAL PRADESH |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 23:30 |
End Date |
19/05/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of fast track buildings at iit bombay
Construction of fast track buildings including design ,drawing, finishing works, water supply and sanitary installations, internal and external electrical installation , lan, wifi,cctv, fire-fighting system, automatic fire alarm etc. at iit bombay
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Read moreSupply and construction of maintenance flight hanger with dispersal area
Supply and construction of maintenance flight hanger with dispersal area
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis
Read moreSupply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.
Supply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.
Read moreWork of strenghthening of existing 220 kv and 132 kv main bus along with supply of material and associated works at 220 kv sub station banda under etd banda.
Work of strenghthening of existing 220 kv and 132 kv main bus along with supply of material and associated works at 220 kv sub station banda under etd banda.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreConstruction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii
Construction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii
Read moreof your Industry type