Tender Details
About Tender
🚂 Invitation For Bids: Power Supply Arrangement For Lifts At Multiple Railway Stations 🚦 The Ministry Of Railways, Under The Aegis Of The Central Government, Invites Bids For A Power Supply Arrangement To Facilitate The Smooth Operation Of 20 Nos. Lifts At Jaunpur Jn., Pratapgarh Jn., Raebareli Jn., Sultanpur, Unnao, And Prayag Stations, Under The Amrit Bharat Station Scheme. 📅 Bid Submission Deadline: June 25, 2024, 11:30 Am Earnest Money Deposit (Emd): Inr 161,600 Interested Bidders Should Review The Tender Document For Complete Details And Submission Guidelines. The Project Is Part Of The Amrit Bharat Station Scheme, Aimed At Transforming Railway Stations Into Modern, Clean, And Safe Facilities For Passengers. Keywords: Power Supply, Lifts, Railway Stations, Ministry Of Railways, Amrit Bharat Station Scheme, Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Power Supply Arrangement For 20 Nos. Lifts At Jaunpur Jn, Pratapgarh Jn., Raebareli Jn., Sultanpur, Unnao &Amp Prayag Stations Over Lko Division Under Amrit Bharat Station Scheme .
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75450610 |
Reference Number |
04C-DyCEE-GSU-LKO-2024-25 |
Tender Fee | 0 |
EMD | 1.62 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75450610/viewNitPdf_4591874.pdf |
Start Date | June 01, 2024 21:25 |
End Date |
25/06/2024 ( Expired 333 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Supply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Read moreSupply of man-power cum guarding arrangement (40 nos) for operation of valves of water supply network for kulti area (br.-viii, ix, x) under amc.
Supply of man-power&#x0d cum guarding&#x0d arrangement (40 nos)&#x0d for operation of valves&#x0d of water supply&#x0d network for kulti area&#x0d (br.-viii, ix, x) under&#x0d amc.
Read moreSupply and delivery of various spares for 220/6.6kv substation, 3000kw/6.6kv vertical and hsc pumpsets like impeller, shaft sleeves, 6.6kv capacitors and de nde bearings etc., for raw water pumping stations at murmur and bommakal under gdwss ph-i under sd-iv(electrical), td-iv, control room.
Supply and delivery of various mandatory spares for 220/6.6kv substation, 3000kw/6.6 kv vertical and hsc pump sets like impellers, shaft sleeves, 6.6kv capacitors, and de nde bearings etc,. for raw pumping stations at murmur and bommakal under godavari drinking water supply scheme, phase-i under sd-iv(electrical), transmission division -iv, control room, secunderabad.
Read moreSupply of 34 nos 33kv st. thru heat shrink jointing kit for 33kv 3x400 sq mm xlpe cable at newtown divisional store under newtown division.
Supply of 34 nos 33kv st. thru heat&#x0d shrink jointing kit for 33kv 3x400 sq&#x0d mm xlpe cable at newtown divisional&#x0d store under newtown division.
Read moreSitc of power supply arrangement for flooding areas under disaster
Sitc of power supply arrangement for flooding areas under disaster&#x0d management at hindmata chowk.
Read moreSitc of power supply arrangement for flooding areas under disaster
Sitc of power supply arrangement for flooding areas under disaster&#x0d management at st. xaviers ground, parel.
Read moreSupply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Read moreSupply and laying of armoured copper control cable for dc and ac power supply including tripping circuit for 3 nos. 33kv c. r. panel and 6nos 11kv o.c.b. at 33kv nlocp sub-station under cv area-xii. bccl
Supply and laying of armoured copper control cable for dc and ac power supply including tripping circuit for 3 nos. 33kv c. r. panel and 6nos 11kv o.c.b. at 33kv nlocp sub-station under cv area-xii. bccl
Read moreKed/110 of 2024-25 dated 29.01.2025 for creation of 100kva sub stations alongwith ht/lt line at mirpur ram-i, mirpur ram-ii, lakhnote-i, lakhnote-ii and saidpur under water supply scheme jjm phe in respect of jpdcl electric sd kathua of ed kathua
Creation of 100kva sub stations alongwith ht/lt line at mirpur ram-i, mirpur ram-ii, lakhnote-i, lakhnote-ii and saidpur under water supply scheme jjm phe in respect of jpdcl electric sub division kathua of electric division kathua on turnkey basis
Read moreAdditional requirement for establishing interconnection between source side and inductive load side arrangement of clear water boosting station at surface based w/s scheme for ashokenagar block under surface water based water supply scheme for arsen
Additional requirement for establishing interconnection between source side and inductive load side arrangement of clear water boosting station at surface based w/s scheme for ashokenagar block under surface water based water supply scheme for arsen
Read moreof your Industry type