Construction Of 33 Kv Line And 33/11 Kv Substation Under Edd Ballia Nagar For Jal Jeevan Mission In Full Deposit Scheme On Turnkey Basis
|
Description |
Construction Of 33 Kv Line And 33/11 Kv Substation Under Edd Ballia Nagar For Jal Jeevan Mission In Full Deposit Scheme On Turnkey Basis&Amp#X0d
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_PVVNV_974796_1 |
Reference Number |
43/EDC(B)/2024-25 |
Tender Fee | 5900 |
EMD | 4.69 Lakh |
Tender Value | |
Place | EDD-Ballia nagar |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1868001 |
Start Date | April 25, 2025 14:30 |
End Date |
01/05/2025 ( Expired 44 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreof your Industry type