Tender Details

About Tender

🏗️ Invitation For Bids: Hard Standing Provision At Saaj 🛠️ The E In C Branch Of Military Engineer Services, Under The Central Government, Invites Bids For The Provision Of Hard Standing At Saaj For The Loading Point Under Age(i) Cif(r) Project. 📅 Bid Submission Deadline: June 27, 2024, 6:00 Pm Tender Fee: Inr 500 Earnest Money Deposit (Emd): Inr 19400 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion. The Project Will Be Awarded To The Bidder Who Best Meets The Requirements And Offers The Most Competitive Terms. Keywords: Hard Standing, Loading Point, Saaj, Military Engineer Services, Central Government, Construction, Bid, Tender, Emd, E In C Branch
Particulars Details
Title
Provn Of Hard Standing For Loading Point At Saaj Under Age(i) Cif(r)
Description
Provn Of Hard Standing For Loading Point At Saaj Under Age(i) Cif(r)
Organisation E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department
Tender Id 2024_MES_657596_1
Reference
Number
AGE(I)/R-27/2024-25
Tender Fee 500
EMD 19400
Tender Value -
Place SAAJ
Link
View Original Tender Notice

https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=735715

Start Date June 19, 2024 17:30
End Date
Expired 27/06/2024

Expired 838 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Provn of upvc doors at hq cif (r) under age (i) cif (r ).

Provn of upvc doors at hq cif (r) under age (i) cif (r ).

Read more
Addn/alteration of internal wiring and panelling work in bldg no. t-149 at hq cif (r) under age (i) cif (r )

Addn/alteration of internal wiring and panelling work in bldg no. t-149 at hq cif (r) under age (i) cif (r )

Read more
Special repair to wiring to bldg no. t-26 (offrs living) at manjakote garrison under age (i) cif (r)

Special repair to wiring to bldg no. t-26 (offrs living) at manjakote garrison under age (i) cif (r)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Repair to drain, path and hard standing etc at 43 rr saaj under age(i) cif(r).

Repair to drain, path and hard standing etc at 43 rr saaj under age(i) cif(r).

Read more
Provn of bathroom and toilets with allied infrastructure at saaj under age(i) cif(r).

Provn of bathroom and toilets with allied infrastructure at saaj under age(i) cif(r).

Read more
Provn of perimeter pathway with interlocking tiles at tac hq saaj of 43 rr bn under age(i) cif(r)

Provn of perimeter pathway with interlocking tiles at tac hq saaj of 43 rr bn under age(i) cif(r)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise