Maintenance And Repairing Of 2 Nos 1 Mva 11 Kv/3.3 Kv Power Transformer And 1 Nos 1.6 Mva 11 Kv/3.3 Kv Power Transformer At Site Along With Door Interlocking Of Ht Panel At Topa Main Substation Under Kuju Area.
|
Description |
Maintenance And Repairing Of 2 Nos 1 Mva 11 Kv/3.3 Kv Power Transformer And 1 Nos 1.6 Mva 11 Kv/3.3 Kv Power Transformer At Site Along With Door Interlocking Of Ht Panel At Topa Main Substation Under Kuju Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_330600_1 |
Reference Number |
GM (K)/EnM/eTender/24-25/279 |
Tender Fee | 0 |
EMD | 12700 |
Tender Value | |
Place | GM UNIT KUJU |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342692 |
Start Date | March 01, 2025 00:25 |
End Date |
10/03/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 400 kv and 220 kv ais bays along with transformer plinth for erection testing and commissioning of 500 mva transformer and its associated work at 400 kv substation kashipur
Construction of 400 kv and 220 kv ais bays along with transformer plinth for erection testing and commissioning of 500 mva transformer and its associated work at 400 kv substation kashipur
Read more1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning and maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
Read moreRepairing, maintenance along with providing and fixing of cts, pts, mocbs with maintenance of 33 kv bus-bar system and control relay panel at main sub station of nandira colliery.
Repairing, maintenance along with providing and fixing of cts, pts, mocbs with maintenance of 33 kv bus-bar system and control relay panel at main sub station of nandira colliery.
Read moreRepairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Repairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Read moreRepairing / overhauling of 4 nos. (2 nos. meditron and 2 nos. electroteknica) make vcb panels, 6.6 kv/3.3 kv at main substation of dipka expansion project.
Repairing / overhauling of 4 nos. (2 nos. meditron and 2 nos. electroteknica) make vcb panels, 6.6 kv/3.3 kv at main substation of dipka expansion project.
Read moreRewinding and repairing of 250 kva, 3.3 kv/440 volt make transgietz enterprises sl-te/211 transformer installed at east colony of kuju colliery under kuju area.
Rewinding and repairing of 250 kva, 3.3 kv/440 volt make transgietz enterprises sl-te/211 transformer installed at east colony of kuju colliery under kuju area.
Read moreThe work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
The work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreRepairing of control panel circuit/ panel of ck300 shovel sl. no. 737, 739 and 764 deployed at topa ocp, kuju area.
Repairing of control panel circuit/ panel of ck300 shovel sl. no. 737, 739 and 764 deployed at topa ocp, kuju area.
Read moreRewinding, overhauling and servicing of cooling fans of 160 mva transformer 1, 2, 3 and 20 mva transformer at 220 kv sub station motiram adda under electricity 400 kv sub station division motiram adda gorakhpur
Rewinding, overhauling and servicing of cooling fans of 160 mva transformer 1, 2, 3 and 20 mva transformer at 220 kv sub station motiram adda under electricity 400 kv sub station division motiram adda gorakhpur