Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Track Renewals Of Wob On Line Including Overhauling Of Wob Level Crossing, Lifting And Packing Of Track With Metal Ballast 2nd Call.
|
| Description |
Complete Track Renewals Of Wob On Line Including Overhauling Of Wob Level Crossing, Lifting And Packing Of Track With Metal Ballast 2nd Call.
|
| Organisation | Visakhapatnam Port Trust | Public Sector Undertakings |
| Tender Id | 2025_VPT_256823_1 |
|
Reference Number |
IENG/CP/SE (Rlys)/T/147, Dt. 26.11.2025 |
| Tender Fee | 1180 |
| EMD | 1.33 Lakh |
| Tender Value | - |
| Place | VPA |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=296169 |
| Start Date | November 26, 2025 23:30 |
| End Date |
Expired
18/12/2025
Expired 303 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ancillary work of level crossing in connection with complete track renewal work in rkb-plc section under aden/line-ii/ju
Ancillary work of level crossing in connection with complete track renewal work in rkb-plc section under aden/line-ii/ju
Read moreRelay,ac immune,plug in type,style qta2,dc neutral track 9 ohm 2f 1b contacts,front and back contacts metal to carbon complete with plug board retaining clip & connectors confirming to brs:939a,brs:966 appendix f2 irs:s 34 irs:23 as applicable.
Relay,ac immune,plug in type,style qta2,dc neutral track 9 ohm 2f 1b contacts,front and back contacts metal to carbon complete with plug board retaining clip & connectors confirming to brs:939a,brs:966 appendix f2 irs:s 34 irs:23 as applicable.
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreSupply of relay, ac immune, plug-in-type, style qbat, aci, dc biased track relay 9 ohms, 2f-2b contacts, front and back contacts metal to carbon, complete with plug board, retaining clip and connectors conforming as per rdso/spn/84 ver 2.0 or latest if any interlocking code is abejx.
Supply of relay, ac immune, plug-in-type, style qbat, aci, dc biased track relay 9 ohms, 2f-2b contacts, front and back contacts metal to carbon, complete with plug board, retaining clip and connectors conforming as per rdso/spn/84 ver 2.0 or latest if any interlocking code is abejx.
Read moreMaintenance of bg track including lifting and packing,boxing and profiling, pulling back of rails/panels, anti-corrosive painting,de-stressing, slewing and realigning of curves, overhauling, removing weeds & bushes, cleaning of side drains, carring out pre-tamping, during tamping and post-tamping works and other ancillary works under the jurisdiction of sse/p.way/jrna (for one(1) year period)
Maintenance of bg track including lifting and packing,boxing and profiling, pulling back of rails/panels, anti-corrosive painting,de-stressing, slewing and realigning of curves, overhauling, removing weeds & bushes, cleaning of side drains, carring out pre-tamping, during tamping and post-tamping works and other ancillary works under the jurisdiction of sse/p.way/jrna (for one(1) year period)
Read moreMaintenance of bg track including lifting and packing, boxing and profiling, pulling back of rails/ panels, anti-corrosive painting, de-stressing, slewing and realigning of curves, overhauling, removing weeds & bushes, cleaning of side drains, carrying out pre-tamping, during tamping and post-tamping works and other ancillary works under the jurisdiction of sse/p. way/dmr (for one (1) year period)
Maintenance of bg track including lifting and packing, boxing and profiling, pulling back of rails/ panels, anti-corrosive painting, de-stressing, slewing and realigning of curves, overhauling, removing weeds & bushes, cleaning of side drains, carrying out pre-tamping, during tamping and post-tamping works and other ancillary works under the jurisdiction of sse/p. way/dmr (for one (1) year period)
Read moreProtective knee pads with ce level 2 protection suitable for training activities,elbow guards with ce level 1 protection made of impact resistant material suitable for training activities,stretch wrapping film strong and flexible suitable for packing wrapping and protecting materials,customised good quality bedsheets with unit crest embossing,good quality pillow covers with neat stitching and finish,premium white towels soft and absorbent with good quality fabric,shower curtains made of water resistant material,cold metal repair compound suitable for bonding filling and repairing metal surfaces,plastic round shape dust bin with lid 30 litres capacity durable,plastic dust bin with lid 80 litres capacity durable
Protective knee pads with ce level 2 protection suitable for training activities,elbow guards with ce level 1 protection made of impact resistant material suitable for training activities,stretch wrapping film strong and flexible suitable for packing wrapping and protecting materials,customised good quality bedsheets with unit crest embossing,good quality pillow covers with neat stitching and finish,premium white towels soft and absorbent with good quality fabric,shower curtains made of water resistant material,cold metal repair compound suitable for bonding filling and repairing metal surfaces,plastic round shape dust bin with lid 30 litres capacity durable,plastic dust bin with lid 80 litres capacity durable
Read moreStrengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Read moreSteel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Read moreComplete track renewals of wob on line including overhauling of wob level crossing
Complete track renewals of wob on line including overhauling of wob level crossing and lifting and packing of track with metal ballast.
Read moreof your Industry type