Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Track Renewals Of Wob On Line
|
| Description |
Complete Track Renewals Of Wob On Line Including Overhauling Of Wob Level Crossing And Lifting And Packing Of Track With Metal Ballast 2nd Call
|
| Organisation | Visakhapatnam Port Trust | Public Sector Undertakings |
| Tender Id | 2025_VPT_227627_1 |
|
Reference Number |
IENG/CP/SE(Rlys)/T/93 Dt. 21.02.2025 |
| Tender Fee | 1180 |
| EMD | 1.33 Lakh |
| Tender Value | - |
| Place | VPA |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=255533 |
| Start Date | February 21, 2025 20:30 |
| End Date |
Expired
08/03/2025
Expired 590 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposed supply and execution of at welding for track/casual renewals works and emergency repairs in track on nagpur division under den (n) nagpur s jurisdiction.
Proposed supply and execution of at welding for track/casual renewals works and emergency repairs in track on nagpur division under den (n) nagpur s jurisdiction.
Read morePeriodical renewals to siddipet - venkatraopet from km 9/400 to 10/100 in siddipet district.
Periodical renewals to siddipet - venkatraopet from km 9/400 to 10/100 in siddipet district.
Read moreComplete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read moreAncillary work of level crossing in connection with complete track renewal work in rkb-plc section under aden/line-ii/ju
Ancillary work of level crossing in connection with complete track renewal work in rkb-plc section under aden/line-ii/ju
Read moreTrack chain ring 55t,track chain ring 57t,track chain ring 58t,track chain ring 59t,track chain ring 60t,track chain ring 61t,track chain ring 62t,track chain ring 63t,track chain ring 64t,track chain ring 65t,track chain ring 66t,track chain ring 67t,track chain ring 68t,track cog 12t,track chain,road chain,crank plate 11 speed 52t,crank plate 11 speed 53t,rear derailleur,front wheel bearings,cassette,rd pulley,bottom bracket with spacer,headbearing,shifter,tubular tyre,tubular tyre training,road tyre,brake gear cable end cap,gear housing end cap,allen key bolts,tube,brake shoes,quick release,track wheel axle nut,track chain plate nuts,wheel alignment stand,road cycle wheel set,track cycle front wheel quick release
Track chain ring 55t,track chain ring 57t,track chain ring 58t,track chain ring 59t,track chain ring 60t,track chain ring 61t,track chain ring 62t,track chain ring 63t,track chain ring 64t,track chain ring 65t,track chain ring 66t,track chain ring 67t,track chain ring 68t,track cog 12t,track chain,road chain,crank plate 11 speed 52t,crank plate 11 speed 53t,rear derailleur,front wheel bearings,cassette,rd pulley,bottom bracket with spacer,headbearing,shifter,tubular tyre,tubular tyre training,road tyre,brake gear cable end cap,gear housing end cap,allen key bolts,tube,brake shoes,quick release,track wheel axle nut,track chain plate nuts,wheel alignment stand,road cycle wheel set,track cycle front wheel quick release
Read moreTrack chain link assy 20x track chain link lh 20x track chain link rh 30 x track chain link pin 20x track chain link bush 40x track chain dust seal 50 x track chain nut and bolt,quadruple sys protection valve,master cylinder assy,wheel cylinder assy,hose pipe,air breather glass
Track chain link assy 20x track chain link lh 20x track chain link rh 30 x track chain link pin 20x track chain link bush 40x track chain dust seal 50 x track chain nut and bolt,quadruple sys protection valve,master cylinder assy,wheel cylinder assy,hose pipe,air breather glass
Read moreTrack-i - sitc and operationalization of the ai cloud,track-ii - sitc of dc infra non-it in epc mode with o and m,track-ii - sicbo of the ai cloud it infrastructure,any other services, allied works etc.,any other items, component etc. required to complete the solution.
Track-i - sitc and operationalization of the ai cloud,track-ii - sitc of dc infra non-it in epc mode with o and m,track-ii - sicbo of the ai cloud it infrastructure,any other services, allied works etc.,any other items, component etc. required to complete the solution.
Read moreof your Industry type