Tender Details

About Tender

🌧️ Urgent: Emergency Monsoon Preparedness Initiative 🌊 The Irrigation Department Of The State Government And Union Territories Is Calling For Bids To Undertake The Emergency Desilting And Cleaning Of The Illimala Moozhikkal Thodu From Kadanthottu Bridge To Kuttankeril Chal In Chengannur Municipality. 🚧 📅 Bid Submission Deadline: May 27, 2024, 5:00 Pm 💸 Tender Fee: Inr 555 💰 Earnest Money Deposit: Inr 5577 This Project Aims To Address The Monsoon Challenges By Removing Water Hyacinth And Desilting The Thodu To Ensure Unhindered Water Flow And Prevent Potential Flooding. Interested Contractors Must Submit Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, In Accordance With The Project Specifications. Keywords: Emergency Monsoon Preparedness, Desilting, Water Hyacinth Removal, Irrigation Department, Chengannur Municipality, Tender, Emd, Government Contract
Particulars Details
Title
Emergency Monsoon Preparedness 2024 Desilting And Cleaning Of Illimala Moozhikkal Thodu From Kadanthottu Bridge To Kuttankeril Chal In Chengannur Municipality
Description
Water Hyacinth And Desilting If Thodu
Organisation Irrigation Department | State Govt. and UT
Tender Id 2024_Irrig_673384_1
Reference
Number
IRR/KP/TR/5474/2023_5_1_1/1
Tender Fee 555
EMD 5577
Tender Value
Place Chengannur
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1047495
Start Date May 23, 2024 22:30
End Date

27/05/2024 ( Expired 385 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand

Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise