Tender Details
About Tender
🚚🏭 E Tender Invitation: Supply Transportation & Delivery Of Local Materials 📍 West Bengal State Electricity Distribution Co. Ltd (Wbsedcl), Under The State Government, Invites Tenders From Reputable Vendors For The Supply, Transportation, And Delivery Of Various Local Materials Within The Joynagar Division, West Bengal. 📅 Submission Deadline: April 8, 2024, 3:00 Pm Tender Security Amount: Inr 26,606 Interested Bidders Must Submit Their Tenders In Accordance With The Tender Document, Which Outlines The Detailed Requirements, Specifications, And Terms And Conditions For The Supply Of Materials. Keywords: Wbsedcl, Supply Transportation, Local Materials, Joynagar Division, E Tender, West Bengal State Electricity Distribution, Government TenderParticulars | Details |
---|---|
Title |
Dm/Jng/E Tender/23 24/816
|
Description |
Supply Transportation Delivery Of Different Local Materials Under Joynagar Division Wbsedcl
|
Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
Tender Id | 2024_WBSED_685758_1 |
Reference Number |
DM/JNG/E-TENDER/23-24/816 |
Tender Fee | 0 |
EMD | 26606 |
Tender Value | |
Place | JOYNAGAR DIVISION |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1493827 |
Start Date | March 15, 2024 21:30 |
End Date |
08/04/2024 ( Expired 412 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreReconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Read moreWork of augmentation of water supply system of cantonment board, morar under amrut 2.0
Work of augmentation of water supply system of cantonment board, morar under amrut 2.0
Read moreDesign,detailed engg,supply,etc of 230/110kv ais ss with icts, swtgrs, crp,sas,ctrlroom,civil works at kongalnagaram and provision of 1no 230kv bay at exg anaikadavu 400kv ais ss on total turnkey basis under pkg 8 of gec2 funded by mnre and kfw
Design,detailed engg,supply,etc of 230/110kv ais ss with icts, swtgrs, crp,sas,ctrlroom,civil works at kongalnagaram and provision of 1no 230kv bay at exg anaikadavu 400kv ais ss on total turnkey basis under pkg 8 of gec2 funded by mnre and kfw
Read moreAAAAAAAAAA
Login to viewSupply and installation of submersible pump motor sets at flood affected river bed tubewell with supply of necessary substitutes at different water supply scheme under arsha block under pmd, phe dte. in the district of purulia.
Read morePerformance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Performance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreLoading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Read moreNiet no. - 11 of the fy 2025-2026 of the ee/bqa, phe dte.(sl.no-16)
Repairing and renovation of office buliding including toilet under bankura division phe dte.
Read moreof your Industry type