Tender Details
About Tender
🏞️ Invitation For Bids: Champacherra Bank Revetment Work 🏗️ The Chief Engineer, Pwd (Wr), State Govt. And Ut, Invites Bids For The Protection Of Champacherra Bank Near The Residence Of Sachindra Debbarma At Kashidas Para, Champaknagar Vc, Belbari R.D. Block, Under The Belbari Revenue District. The Project Involves Revetment Work For The Year 2021 22/S Bank By Providing And Placing Cement Concrete Blocks With A Length Of 65 Meters. 📅 Bid Submission Deadline: July 19, 2024, 3:00 Pm Tender Fee: Inr 1000 Emd: Inr 27,394 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Demonstration Of Their Ability To Execute Similar Projects Successfully. Keywords: Champacherra Bank, Revetment Work, Cement Concrete Blocks, Pwd (Wr), State Govt. And Ut, Tender, Bid Submission, Emd, AgartalaParticulars | Details |
---|---|
Title |
Protection Of Champacherra Bank Near The House Of Sachindra Debbarma At Kashidas Para Of Champaknagar Vc Under Belbari R.D. Block During The Year 2021 22/S Bank Revetment Work By Providing And Placing Cement Concrete Block (Length 65.00 Mtr.) (Job N
|
Description |
Protection Of Champacherra Bank Near The House Of Sachindra Debbarma At Kashidas Para Of Champaknagar Vc Under Belbari R.D. Block During The Year 2021 22/S Bank Revetment Work By Providing And Placing Cement Concrete Block (Length 65.00 Mtr.) (Job N
|
Organisation | Chief Engineer PWD (WR) | State Govt. and UT |
Tender Id | 2024_CEWR_50405_1 |
Reference Number |
03_EE_WRD_I_DNIET_2024_25 |
Tender Fee | 1000 |
EMD | 27394 |
Tender Value | |
Place | AGARTALA |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=51254 |
Start Date | July 04, 2024 23:30 |
End Date |
19/07/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection of left bank erosion of local cherra behind indranagar kalibari under amc ward no- 10 during the year 2024-25_sh _ bank revetmentwork by cement concrete block and filling of depression by mechanical earth for the length of 100.00 mtr.
Protection of left bank erosion of local cherra behind indranagar kalibari under amc ward no- 10 during the year 2024-25_sh _ bank revetmentwork by cement concrete block and filling of depression by mechanical earth for the length of 100.00 mtr.
Read moreProtection of village road and adjacent land near chandimata club under amc ward no 44 from erosion of right bank of bangeswar river during the year 2024-25_ sh_ bank revetment work be sand cement block for the length of 50.00 mtr.
Protection of village road and adjacent land near chandimata club under amc ward no 44 from erosion of right bank of bangeswar river during the year 2024-25_ sh_ bank revetment work be sand cement block for the length of 50.00 mtr.
Read moreAnti erosion work along the left bank of river manu for protection of dalugaon baraitali embankment at hower bazar from the erosion of manu river under chandipur r.d block during the year 2024 25 sh bank revetment work for a length of 55.00mtr by s
Anti erosion work along the left bank of river manu for protection of dalugaon baraitali embankment at hower bazar from the erosion of manu river under chandipur r.d block during the year 2024 25 sh bank revetment work for a length of 55.00mtr by s
Read moreAnti erosion work along the left bank of river manu for protection of dalugaon baraitali embankment at hower bazar from the erosion of manu river under chandipur r.d block during the year 2024 25 sh bank revetment work for a length of 55.00mtrgr.ii
Anti erosion work along the left bank of river manu for protection of dalugaon baraitali embankment at hower bazar from the erosion of manu river under chandipur r.d block during the year 2024 25 sh bank revetment work for a length of 55.00mtr grii
Read more111 anti erosion works and 01 rain water harvesting (rwh) scheme_ protection of right bank of river gomati from erosion near nepal barman house to 200.0 mtr downstream by providing cement concrete block in rangamatia g.p. at nalchar rd block under w.
111 anti erosion works and 01 rain water harvesting (rwh) scheme_ protection of right bank of river gomati from erosion near nepal barman house to 200.0 mtr downstream by providing cement concrete block in rangamatia g.p. at nalchar rd block under w.
Read moreFdr/ protection from the erosion of baluar cherra at upstream of r.c.c. culvert near the land of anil debbarma of ramsankar vc under hezamara block during the year 2024-25/ sh_- providing and placing of sand cement block (length_100.00 mtr).
Fdr/ protection from the erosion of baluar cherra at upstream of r.c.c. culvert near the land of anil debbarma of ramsankar vc under hezamara block during the year 2024-25/ sh_- providing and placing of sand cement block (length_100.00 mtr).
Read moreFdr/ protection of li scheme at chintarampara from massive erosion of sonai river bank under hezamara block during the year 2024-25/ sh_- manufacturing and placing of cement concrete block ( l_60.00 mtr) (job no. tr/65/se/wrc-1/2059/ 2024-25)
Fdr/ protection of li scheme at chintarampara from massive erosion of sonai river bank under hezamara block during the year 2024-25/ sh_- manufacturing and placing of cement concrete block ( l_60.00 mtr) (job no. tr/65/se/wrc-1/2059/ 2024-25)
Read moreFdr/ protection of li scheme at asrai from massive erosion of sonai river bank under hezamara block during the year 2024-25/ sh_- manufacturing and placing of cement concrete block (l_60.00 mtr) (job no. tr/64/se/wrc-1/2059/ 2024-25)
Fdr/ protection of li scheme at asrai from massive erosion of sonai river bank under hezamara block during the year 2024-25/ sh_- manufacturing and placing of cement concrete block (l_60.00 mtr) (job no. tr/64/se/wrc-1/2059/ 2024-25)
Read moreFdr / mtc. of different roads under jatanbari pwd (randb) sub-division / sh- protection work by placing sal post, wire crates, cement concrete block pitching, wbm-iii , re-carpeting, sand seal coating etc. during the year 2024-25. ( 2nd call)
Fdr / mtc. of different roads under jatanbari pwd (randb) sub-division / sh- protection work by placing sal post, wire crates, cement concrete block pitching, wbm-iii , re-carpeting, sand seal coating etc. during the year 2024-25. ( 2nd call)
Read moreProtection of right bank erosion of river sinai near gabordi bazar _rcc bridge_ at pravapur adc village under jampuijala r.d block , during the year 2024_25_ sh bank revetmentwork by sand cement block and earth work for the length of 150.00 mtr
Protection of right bank erosion of river sinai near gabordi bazar _rcc bridge_ at pravapur adc village under jampuijala r.d block , during the year 2024_25_ sh bank revetmentwork by sand cement block and earth work for the length of 150.00 mtr
Read moreof your Industry type