Tender Details

Particulars Details
Title
Supplying And Placing Of Ob/ Sand Filled Cement Bags Along Rain Cut Beside Roads, Embankment, Pumping Sump At Amgaon Ocp For Monsoon Preparation Of Bishrampur Amgaon Sub Area.
Description
Supplying And Placing Of Ob/ Sand Filled Cement Bags Along Rain Cut Beside Roads, Embankment, Pumping Sump At Amgaon Ocp For Monsoon Preparation Of Bishrampur Amgaon Sub Area.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_332011_1
Reference
Number
GM/BSPR/Civil/e-tender/ 2024-25/63 Dt.10.03.2025
Tender Fee 0
EMD 6700
Tender Value
Place Amgaon Sub Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344290
Start Date March 13, 2025 15:30
End Date

22/03/2025 ( Expired 29 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
De-silting, cleaning and making of drains during monsoon along the road to colony, other mine premises and other service roads at naigaon deep ocm and neeljay deep ocm under neeljay sub area of wani area.

De-silting, cleaning and making of drains during monsoon along the road to colony, other mine premises and other service roads at naigaon deep ocm and neeljay deep ocm under neeljay sub area of wani area.

Read more
Providing toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.

Providing toe wall adjacent to embankment/dump portion for protection of soil erosion in ob dump area at jampali ocm of jampali sub area.

Read more
Providing filling and placing ob filled cement bags at various places inside the quarry for support for de-watering pipe line and protection of silt and raincuts of ukni deep ocm under ukni-junad sub area

Providing filling and placing ob filled cement bags at various places inside the quarry for support for de-watering pipe line and protection of silt and raincuts of ukni deep ocm under ukni-junad sub area

Read more
Fdr work of sonamura durgapur and paddadhapa embarkment,protection of vernerable li scheme under the jurisdiction of water resource sub-division, melaghar during the year 2025-2026 sh_ supplying of empty gunny bags,sand and placing of filled up sa

Fdr work of sonamura durgapur and paddadhapa embarkment,protection of vernerable li scheme under the jurisdiction of water resource sub-division, melaghar during the year 2025-2026 sh_ supplying of empty gunny bags,sand and placing of filled up sa

Read more
Cleaning of drain at mgr siding along with disposed of slush over engine escape line and cleaning of existing drain, cutting of kuchha drain and cleaning of garland drain aside ob dump no. 4,5,10 and 11 in monsoon for the year 2025-26lingaraj ocp la

Cleaning of drain at mgr siding along with disposed of slush over engine escape line and cleaning of existing drain, cutting of kuchha drain and cleaning of garland drain aside ob dump no. 4,5,10 and 11 in monsoon for the year 2025-26lingaraj ocp la

Read more
Maintenance n repairing of 11 kv grade oh line from parej substation to tapin north substation for monsoon preparation at tapin north ocp under hazaribagh area.

Maintenance n repairing of 11 kv grade oh line from parej substation to tapin north substation for monsoon preparation at tapin north ocp under hazaribagh area.

Read more
Strengthening of embankment by laying sand bags at few places on the slope of embankment, hume pipe culverts and m.s. pipe line support inside the mines and cleaning of hume pipes culverts at bocm and bc 3 and 4 pits under ballarpur sub area

Strengthening of embankment by laying sand bags at few places on the slope of embankment, hume pipe culverts and m.s. pipe line support inside the mines and cleaning of hume pipes culverts at bocm and bc 3 and 4 pits under ballarpur sub area

Read more
Cutting of catch drain, sump and hume pipe arrangement along ob dump and haul road for monsoon preparation activities at rocp under rajhara area.

Cutting of catch drain, sump and hume pipe arrangement along ob dump and haul road for monsoon preparation activities at rocp under rajhara area.

Read more
Cleaning of pit bottom sump at no 4 pit in dobrana rv seam to increase the sump capacity for monsoon preparation 2025-2026 of lower kenda colliery under kenda area ecl

Cleaning of pit bottom sump at no 4 pit in dobrana rv seam to increase the sump capacity for monsoon preparation 2025-2026 of lower kenda colliery under kenda area ecl

Read more
Supplying and laying sand ob earth filled cement bags cleaning of hume pipe shifting minor replacement of existing gi sheet of shelters in mine premises and other misc. civil allied works regarding monsoon at pouni ii expansion ocm under pouni sub ar

Supplying and laying sand ob earth filled cement bags cleaning of hume pipe shifting minor replacement of existing gi sheet of shelters in mine premises and other misc. civil allied works regarding monsoon at pouni ii expansion ocm under pouni sub ar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise