Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Garland Drain, Catch Drain And Excavation Of New Drain At Amgaon Ocp For Monsoon Preparation Of Bishrampur Amgaon Sub Area.
|
| Description |
Cleaning Of Garland Drain, Catch Drain And Excavation Of New Drain At Amgaon Ocp For Monsoon Preparation Of Bishrampur Amgaon Sub Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_333327_1 |
|
Reference Number |
GM/BSPR/Civil/e-tender/ 2024-25/68 Dt.26.03.2025 |
| Tender Fee | 0 |
| EMD | 26600 |
| Tender Value | - |
| Place | Amgaon Sub Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345535 |
| Start Date | March 28, 2025 15:30 |
| End Date |
Expired
10/04/2025
Expired 556 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc wall with wind break panels at jainagar siding of bishrampur amgaon sub area at bishrampur area
Construction of rcc wall with wind break panels at jainagar siding of bishrampur amgaon sub area at bishrampur area
Read moreSupply of water by truck mounted tanker of capacity 12kl for dust supression at jainagar siding of bishrampur amgaon sub area bishrampur for 01 year
Supply of water by truck mounted tanker of capacity 12kl for dust supression at jainagar siding of bishrampur amgaon sub area bishrampur for 01 year
Read moreCustom bid for services - providing assistance for pre-monsoon preparation and monsoon management measures in mine-ii
Custom bid for services - providing assistance for pre-monsoon preparation and monsoon management measures in mine-ii
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreConstruction of permanent pcc road over new access trench and extension up to the excavation store shed at jagannathpur ocp, bhatgaon area including 05 (five) years comprehensive maintenance
Construction of permanent pcc road over new access trench and extension up to the excavation store shed at jagannathpur ocp, bhatgaon area including 05 (five) years comprehensive maintenance
Read moreProviding empty cement bags, filling of ob in cement bags, stitching and stacking the same at view point for preparation of sump, pumping station, laying of pipe line and different kind of work in monsoon period at rajnagar ocm
Providing empty cement bags, filling of ob in cement bags, stitching and stacking the same at view point for preparation of sump, pumping station, laying of pipe line and different kind of work in monsoon period at rajnagar ocm
Read moreUrgent providing and fixing pre-cast rcc road gully cover and frame, machine hole covers and frames at various locations under mtc. booth sector 23, in view of preparation for monsoon under the jurisdiction of sde mcph sub divn. no. 18 chandigarh
Urgent providing and fixing pre-cast rcc road gully cover and frame, machine hole covers and frames at various locations under mtc. booth sector 23, in view of preparation for monsoon under the jurisdiction of sde mcph sub divn. no. 18 chandigarh
Read moreExcavation with sub-grade preparation,anti-termite with weed control,sub base with rigid concrete base,steel reinforcement,multilayer cushioned synthetic surface,volleyball net and posts,galvanized steel referee chair,chain link fencing,flood lighting with structural canopy support columns,overhead canopy cover rugged green fibre
Excavation with sub-grade preparation,anti-termite with weed control,sub base with rigid concrete base,steel reinforcement,multilayer cushioned synthetic surface,volleyball net and posts,galvanized steel referee chair,chain link fencing,flood lighting with structural canopy support columns,overhead canopy cover rugged green fibre
Read moreExcavation in trenches for foundation,material and labour for cement concrete,material and labour for mild steel tmt bars,material and labour for roof trusses,supply and fix for mild steel plates,supply and fix mild steel screw bolts,material and labour for preparation of new painted steel surface of any descripation,supply and fix pre painted galvalume aluminum zinc coating gi based corrugated,material and labour reinforced cement concrete nominal mix
Excavation in trenches for foundation,material and labour for cement concrete,material and labour for mild steel tmt bars,material and labour for roof trusses,supply and fix for mild steel plates,supply and fix mild steel screw bolts,material and labour for preparation of new painted steel surface of any descripation,supply and fix pre painted galvalume aluminum zinc coating gi based corrugated,material and labour reinforced cement concrete nominal mix
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreof your Industry type