Tender Details

Particulars Details
Title
Construction Of 4.6 Km Of New Lt Abc At Chathanoor And Karunagapally Divisions Under Electrical Circle Kollam On Turnkey Basis Under Rdss Scheme.
Description
Construction Of 4.6 Km Of New Lt Abc At Chathanoor And Karunagapally Divisions Under Electrical Circle Kollam On Turnkey Basis Under Rdss Scheme.
Organisation Kerala State Electricity Board | State Govt. and UT
Tender Id 2024_KSEB_673935_1
Reference
Number
ET No. 01/EE/PMU-KLM/RDSS-LR/24-25/ dtd. 30.05.2024
Tender Fee 5900
EMD 88500
Tender Value -
Place Kollam
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1048242

Start Date June 03, 2024 23:30
End Date
Expired 13/06/2024

Expired 851 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Read more
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Read more
Construction of 4.6 km of new lt abc at chathannoor and karunagappally divisions under kollam electrical circle on turnkey basis under rdss scheme

Construction of 4.6 km of new lt abc at chathannoor and karunagappally divisions under kollam electrical circle on turnkey basis under rdss scheme

Read more
Construction of 4.6 km of new lt abc at chathannoor and karunagappally divisions under ec kollam on turnkey basis under rdss scheme

Construction of 4.6 km of new lt abc at chathannoor and karunagappally divisions under ec kollam on turnkey basis under rdss scheme

Read more
Reconductoring of 81.7 km of lt abc 3 x 70 sqmm 1 x 50 sqmm 1 x 16 sqmm at kollam circle kollam and karunagappally divisions kollam package 6 under rdss -turnkey basis-package 6

Reconductoring of 81.7 km of lt abc 3 x 70 sqmm 1 x 50 sqmm 1 x 16 sqmm at kollam circle kollam and karunagappally divisions kollam package 6 under rdss -turnkey basis-package 6

Read more
Rdss turnkey work - wayanad - ht reconductoring with abc 14.5 km- lt conversion with abc 21km and reconductoring with lt abc 80.9 km

Development of distribution infrastructure at mananthavady division in wayanad for reconductoring 14.5 kms 11kv oh line using ht abc 3x150-1x120 and converting 21 kms lt single phase line and reconductoring 80.9 km lt line using abc 3x95-1x70-1x16

Read more
Lt reconductoring with lt abc 70 sqmm-5 wire under rdss scheme-palakkad circle

Lt reconductoring with lt abc 70 sqmm-5 wire under revamped reforms-based and results-linked, distribution sector scheme.

Read more
Rdss turnkey work - wayanad - lt abc - new line 21km and reconductoring 93 km

Development of distribution infrastructure at kalpetta division in wayanad district under rdss for constructing 21 km new line and reconductoring 93 kms of existing line using lt abc using 3x95-1x70-1x16 sqmm ab cable

Read more
Construction of 4.6km new ltabc using psc poles at chathannoor and karunagappally divisions under electrical circle kollam on turnkey basis under rdss scheme

Construction of 4.6km new ltabc using psc poles at chathannoor and karunagappally divisions under electrical circle kollam on turnkey basis under rdss scheme

Read more
Rdss turnkey works-kalpetta circle

Construction of 11kv ug cable 3x300 sq.mm,2.5km under mananthavady division

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise