Tender Details
Particulars | Details |
---|---|
Title |
Rearrangement Of 3.3 Kv Overhead Circuit For Shifting The Existing Switch Room To The Newly Commissioned 2 X 5 Mva 33 Kv/6.6 Kv Substation Under Birsa Project
|
Description |
Rearrangement Of 3.3 Kv Overhead Circuit For Shifting The Existing Switch Room To The Newly Commissioned 2 X 5 Mva 33 Kv/6.6 Kv Substation Under Birsa Project
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_330561_1 |
Reference Number |
PE(EnM)/Birsa/eTender/24-25/22 |
Tender Fee | 0 |
EMD | 27700 |
Tender Value | |
Place | Birsa Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342650 |
Start Date | February 28, 2025 14:30 |
End Date |
08/03/2025 ( Expired 94 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Day to day maintenance of 11kv oh lines of mohuda group of mines between 33kv/11kv-6.6 kv madhuban d.g substation to mohuda group of mines through mld feeder no. 1 and 2, feeder no. lohapatti 15 for colliery including
Day to day maintenance 
 of 11kv oh lines of 
 mohuda group of mines 
 between 33kv/11kv-6.6 
 kv madhuban d.g 
 substation to mohuda 
 group of mines through 
 mld feeder no. 1 and 2, 
 feeder 
 no. 
 lohapatti 
 15 
 for 
 colliery 
 including
Read morePart re winding and maintenance work of the 11 kv by 3.3 kv, 2 mva, sr. no. 458 a/ 4, east india electricals make transformer, installed at the 11 kv by 3.3 kv main substation of karo ocp, under bnk area
Part re winding and maintenance work of the 11 kv by 3.3 kv, 2 mva, sr. no. 458 a/ 4, east india electricals make transformer, installed at the 11 kv by 3.3 kv main substation of karo ocp, under bnk area
Read moreRate contract for detailed route survey and preparation of dpr for construction of 220 kv d/c transmission line from 160mva, 220/66 kv igc samba to newly proposed 2x25 kv railway traction substation samba (smbx rtss) under the jurisdiction of tlmd4
Rate contract for detailed route survey and preparation of dpr for construction of 220 kv d/c transmission line from 160mva, 220/66 kv igc samba to newly proposed 2x25 kv railway traction substation samba (smbx rtss) under the jurisdiction of tlmd4
Read moreInstallation of 3.3 kv, 300kvar capacitor bank with control panels and shed foundation and connected to the 2.5 mva secondary side switch of 11kv/3.3kv main substation jocp under hazaribag area
Installation of 3.3 kv, 300kvar capacitor bank with control panels and shed foundation and connected to the 2.5 mva secondary side switch of 11kv/3.3kv main substation jocp under hazaribag area
Read moreRepairing of 16 nos. ac machines -11 nos. 1.5 ton and 5 nos. 2 ton- including shifting of out-door unit from ground floor to 3rd floor making iron platform and necessary ei works for rtpcr laboratory of academic building under rampurhat govt medical
Repairing of 16 nos ac machines -11 nos 1.5 ton and 5 nos. 2 ton- including shifting of out-door unit from ground floor to 3rd floor making iron platform and necessary ei works for rtpcr laboratory of academic building under rampurhat govt medical
Read moreSpecial repair for replacement of existing ht oh conductor to ht 11 kv ab cable alongwith connected items for improvement of electric supply distribution network at masimpur mil stn under ge silchar
Special repair for replacement of existing ht oh conductor to ht 11 kv ab cable alongwith connected items for improvement of electric supply distribution network at masimpur mil stn under ge silchar
Read moreEstimate for installation of 1 x 5 mva additional ptr at 33/11 kv s/s chhoti harda at harda town under harda north division under oandm circle harda.
Estimate for installation of 1 x 5 mva additional ptr at 33/11 kv s/s chhoti harda at harda town under harda north division under oandm circle harda.
Read moreMaintenance, necessary line shifting, extensions and upgradation of existing/upcoming 6.6 kv feeders emanating from hingula 33 kv/6.6 kv substation for a period of 730 days.
Maintenance, necessary line shifting, extensions and upgradation of existing/upcoming 6.6 kv feeders emanating from hingula 33 kv/6.6 kv substation for a period of 730 days.
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreEstt for augmentation of capacity 3.15 mva to 5 mva of ptr at 33/11 kv sehod s/s under gyaraspur dc removed 3.15 mva ptr use addl at 33/11 kv nateran dc
Estt for augmentation of capacity 3.15 mva to 5 mva of ptr at 33/11 kv sehod s/s under gyaraspur dc removed 3.15 mva ptr use addl at 33/11 kv nateran dc
Read moreof your Industry type