Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Central India Map 152x171 Cm,China Nepal Combo Map 124x171 Cm,Packing And Forwarding Charges,China
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5658023 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 28, 2024 19:29 |
| End Date |
Expired
19/12/2024
Expired 666 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | M/S Medi enterprises | - | 19-12-2024 00:24:36 | MII MSE | Qualified |
| 2 | NEW INDIA BUSINESS SOLUTIONS | - | 17-12-2024 18:05:18 | MII MSE | Qualified |
| 3 | P K ENTERPRISES | - | 19-12-2024 00:03:34 | MII MSE | Qualified |
Bag closing thread,packing,forwarding,freight,insurance
Bag closing thread,packing,forwarding,freight,insurance
Read moreHumitrol multi dry system,packing,forwarding,freight,insurance
Humitrol multi dry system,packing,forwarding,freight,insurance
Read moreDry flexible disc coupling with finished bore,packing,forwarding,freight,insurance
Dry flexible disc coupling with finished bore,packing,forwarding,freight,insurance
Read morePower source,solenoid valve,solenoid valve packing kit,sensor unit,black box,urinal front panel,service charges
Power source,solenoid valve,solenoid valve packing kit,sensor unit,black box,urinal front panel,service charges
Read moreThe long game how the chinese negotiate with india,india china war,1962 and the mcmahon line saga,1962 border war sino indian territorial disputes and beyond,understaing the india china border the enduring threat of war in high himalaya,india and china at odds in the asian century a diplomatic and strategic history,1962 the war that was not,issue of india-china border conflict has it resolved,the new map energy climate and the clash of nations,the revenge of geogrpahy what the map tells us about coming conflicts,the power of geogrpahy paperback by tim marshall
The long game how the chinese negotiate with india,india china war,1962 and the mcmahon line saga,1962 border war sino indian territorial disputes and beyond,understaing the india china border the enduring threat of war in high himalaya,india and china at odds in the asian century a diplomatic and strategic history,1962 the war that was not,issue of india-china border conflict has it resolved,the new map energy climate and the clash of nations,the revenge of geogrpahy what the map tells us about coming conflicts,the power of geogrpahy paperback by tim marshall
Read more1st lot for vrpl odisha 35 kva 240 v dg set alongwith all accessories components as per specification scope of atc,2nd lot for vrpl odisha 35 kva 240 v dg set alongwith all accessories components as per specification scope of atc,50 kva 240 v dg set alongwith all accessories and components as per specification scope of atc for vrpl odisha,35 kva 240 v dg set alongwith all accessories components as per specification scope of atc for vrpl chhatishgarh,packing forwarding freight tpi ti charges for 7 nos dg for odisha site,packing forwarding freight tpi ti charges for 3 nos dg for cg site
1st lot for vrpl odisha 35 kva 240 v dg set alongwith all accessories components as per specification scope of atc,2nd lot for vrpl odisha 35 kva 240 v dg set alongwith all accessories components as per specification scope of atc,50 kva 240 v dg set alongwith all accessories and components as per specification scope of atc for vrpl odisha,35 kva 240 v dg set alongwith all accessories components as per specification scope of atc for vrpl chhatishgarh,packing forwarding freight tpi ti charges for 7 nos dg for odisha site,packing forwarding freight tpi ti charges for 3 nos dg for cg site
Read moreDesign, manufacture, testing at manufacturers works, packing, forwarding, delivery at site of 110kv composite insulated cross arms and 110kv composite jumper support insulators with fittings and accessories for the upgradation of 66kv dc to 110kv
Design, manufacture, testing at manufacturers works, packing, forwarding, delivery at site of 110kv composite insulated cross arms and 110kv composite jumper support insulators with fittings and accessories for the upgradation of 66kv dc to 110kv
Read moreExworks price incl packing and forwading loading unloading incl gst for mr item sl no 01,inland transportation charges including gst for mr item sl no 01,supervision charges per man day for installation and commissioning incl gst for mr item sl no 01,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 02,inland transportation charges including gst for mr item sl no 02,supervision charges per man day for installation and commissioning incl gst for mr item sl no 02,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 3,inland transportation charges including gst for mr item sl no 3,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 4,inland transportation charges including gst for mr item sl no 4,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 5,inland transportation charges including gst for mr item sl no 5
Exworks price incl packing and forwading loading unloading incl gst for mr item sl no 01,inland transportation charges including gst for mr item sl no 01,supervision charges per man day for installation and commissioning incl gst for mr item sl no 01,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 02,inland transportation charges including gst for mr item sl no 02,supervision charges per man day for installation and commissioning incl gst for mr item sl no 02,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 3,inland transportation charges including gst for mr item sl no 3,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 4,inland transportation charges including gst for mr item sl no 4,exworks price incl packing and forwading loading unloading incl gst for mr item sl no 5,inland transportation charges including gst for mr item sl no 5
Read moreHand held control module hr410,system line 3m pn42 0040,hand held control modulehr510 fs,system line 3m pn 42 1329,freight packing handling charges
Hand held control module hr410,system line 3m pn42 0040,hand held control modulehr510 fs,system line 3m pn 42 1329,freight packing handling charges
Read moreUpply of customised pvc cabin identification card-size 10 cmx6 cm, with 9.5 cm x 5.5 cm display area,supply of acrylic transparent cover, holder for cabin indentification cart-transperant acrylic cover,workout consumbles screws etc,fitting and installation charges-complete fitting and installation of the acrylic holder and pvc cab
Upply of customised pvc cabin identification card-size 10 cmx6 cm, with 9.5 cm x 5.5 cm display area,supply of acrylic transparent cover, holder for cabin indentification cart-transperant acrylic cover,workout consumbles screws etc,fitting and installation charges-complete fitting and installation of the acrylic holder and pvc cab
Read moreof your Industry type