Tender Details

Particulars Details
Title
Fdr / Maintenance Of Different Roads Under Sabroom Pwd (R And B) Sub Division During The Year 2025 26/ Sh Soling, Paver Block, Repair To Pot Holes, Road Side Protection, Removal Of Unsuitable Soil Etc.
Description
Fdr / Maintenance Of Different Roads Under Sabroom Pwd (R And B) Sub Division During The Year 2025 26/ Sh Soling, Paver Block, Repair To Pot Holes, Road Side Protection, Removal Of Unsuitable Soil Etc.
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2025_CEPWD_62667_1
Reference
Number
10(02)/PNIeT/25-26. 19/DNIeT/EE/SBM/DIVN/25-26
Tender Fee 1000
EMD 48503
Tender Value -
Place Sabroom
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=64489

Start Date July 05, 2025 00:25
End Date
Expired 25/07/2025

Expired 450 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairs to road pot holes paver blocks road marking and road furniture at g and h area at naval base kochi under ge nw kochi

Repairs to road pot holes paver blocks road marking and road furniture at g and h area at naval base kochi under ge nw kochi

Read more
Cleaning of drains all along c.t road and removal of sludge at all weigh bridges and drain out of surface water throughout the year with repairing of pot holes in ct road etc at gocp under basundhara

Cleaning of drains all along c.t road and removal of sludge at all weigh bridges and drain out of surface water throughout the year with repairing of pot holes in ct road etc at gocp under basundhara

Read more
Development of road from tarun sangha club to bishalgarh rail station approach (upto abdul khalek house) via netajinagar kalimandir (total length_1point05 km)_sh_ flat brick soling, gsb, wbm_iii, rcc drain, protection work and paver block work etc

Development of road from tarun sangha club to bishalgarh rail station approach (upto abdul khalek house) via netajinagar kalimandir (total length_1point05 km)_sh_ flat brick soling, gsb, wbm_iii, rcc drain, protection work and paver block work etc

Read more
Fdr / maintenance of different roads under sabroom pwd(r and b) sub-division during the year 2025-26/ sh -solling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.

Fdr / maintenance of different roads under sabroom pwd(r and b) sub-division during the year 2025-26/ sh -solling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.

Read more
Removal of unsuitable soil at zone-i and ii atindustrial area bhiwadi

Removal of unsuitable soil at zone-i and ii atindustrial area bhiwadi

Read more
Removal of pot holes on road from darhal town road under pot holes

Removal of pot holes on road from darhal town road under pot holes

Read more
Removal of unsuitable soil at zone-iii,iv and v atindustrial area bhiwadi

Removal of unsuitable soil at zone-iii,iv and v atindustrial area bhiwadi

Read more
Removal of pot holes on road from darhal town road under pot holes 2nd call

Removal of pot holes on road from darhal town road under pot holes 2nd call

Read more
jungle clearance and removal of unsuitable soil along roads at various industrial areas alwar

jungle clearance and removal of unsuitable soil along roads at various industrial areas alwar

Read more
Removal of pot-holes harni bg road .under pot-holes programme s.d.mendhar s.no 02 3rd call

Removal of pot-holes harni bg road .under pot-holes programme s.d.mendhar s.no 02 3rd call

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise