Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Survey And Consultancy Work For Preparation Of Dpr Of Storm Water Drainage System Of Municipal Area Dholpur
|
| Description |
Survey And Consultancy Work For Preparation Of Dpr Of Storm Water Drainage System Of Municipal Area Dholpur
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_DLB_367226_2 |
|
Reference Number |
E-25 |
| Tender Fee | 1000 |
| EMD | 80000 |
| Tender Value | |
| Place | DHOLPUR |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | September 26, 2023 23:30 |
| End Date |
Expired
05/10/2023
Expired 1015 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConsultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreRepair/maint of compound/bdy wall barbed wire chain link fencing area drainage and other misc work at 402 lt/ad bty and amn under ge (i) gos
Repair/maint of compound/bdy wall barbed wire chain link fencing area drainage and other misc work at 402 lt/ad bty and amn under ge (i) gos
Read moreLeftover work for provn of ground exploitation system of aew and c at af stn borjhar
Leftover work for provn of ground exploitation system of aew and c at af stn borjhar
Read moreTiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreAppointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters
Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreAnnual maintenance contract (amc) for complete lubrication system of 24 96 saurav and gaurav dragline working at bina project
Annual maintenance contract (amc) for complete lubrication system of 24 96 saurav and gaurav dragline working at bina project
Read moreof your Industry type